X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565083116000

Well Details

Well ID: 0565083116000
Loading map...
Location: 00/16-31-056-08W5/0
Location Alias: 00/16-31-56-08 W5M
Location Alias 2: 00/16-31-056-08 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 08
Section: 31
County/Municipality: Lac Ste. Anne County
Well Name: PDS PADDLE RIVER 16-31-56-8
Operator Name: Wolverine Energy And Infrastructure Inc.
License Number: 0178659
License Date: 1995-06-16
License Status: Issued
Spud Date: 1995-06-16
Final Drill Date: 1995-06-21
Well Total Depth: 1570.00 m
Surface Hole Latitude: 53.886479
Surface Hole Longitude: -115.172508

For data sources see[1][2]

Well History

Date Event
1995-06-16 Obtained License
1995-06-17 Surface Casing Operation Performed
1995-06-21 Finished Drilling
1995-06-21 Well Mode changed to Drilled and Cased
1995-06-22 Well Log Performed
1995-06-23 Production Casing Operation Performed
1995-06-23 Rig Released
1995-06-27 Well Began Injection
1995-06-27 Well Fluid changed to Water
1995-06-27 Well Type changed to Disposal
1995-07-13 Perforation Treatment Performed - Jet Perforation
1995-07-13 Well Log Performed
1995-07-15 Perforation Treatment Performed - Cement Squeeze
1995-07-15 Plug Back Performed
1995-07-18 Perforation Treatment Performed - Jet Perforation
1995-08-02 Perforation Treatment Performed - Jet Perforation
1995-09-05 Perforation Treatment Performed - Fractured
1995-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-05-01 Well Fluid changed to Water
1998-05-01 Well Mode changed to Suspended
1998-05-01 Well Type changed to Disposal
2000-01-30 Well Fluid changed to Water
2000-01-30 Well Type changed to Disposal
2008-05-20 Perforation Treatment Performed - Jet Perforation
2008-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-07-13 Perforation 1535.00 1540.00 13
2017-12-08 Acid Treatment 1528.00 1545.00 0
1995-07-15 Cement Squeeze 1535.00 1540.00 0
1995-07-18 Perforation 1528.00 1530.00 13
1995-08-02 Perforation 1533.00 1536.00 13
1995-09-05 Fracture 1533.00 1536.00 0
1995-09-08 Acid Treatment 1533.00 1536.00 0
2008-05-20 Perforation 1540.00 1545.00 17
2008-05-20 Perforation 1533.00 1536.00 17
2008-05-23 Acid Treatment 1528.00 1545.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References