X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565190212002

Well Details

Well ID: 0565190212002
Loading map...
Location: 00/12-02-056-19W5/2
Location Alias: 00/12-02-56-19 W5M
Location Alias 2: 00/12-02-056-19 W5/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 19
Section: 02
County/Municipality: Yellowhead County
Well Name: SOC PINE CK 12-2-56-19
Operator Name: AlphaBow Energy Ltd.
License Number: 0082576
License Date: 1980-05-05
License Status: Suspension
Spud Date: 1980-05-08
Final Drill Date: 1980-05-29
Well Total Depth: 2235.00 m
Surface Hole Latitude: 53.812807
Surface Hole Longitude: -116.721995

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-05 Obtained License
1980-05-29 Finished Drilling
1980-05-29 Well Mode changed to Drilled and Cased
1980-05-30 Well Log Performed
1980-05-31 Drill Stem Test Performed
1980-06-04 Production Casing Operation Performed
1980-08-30 Perforation Treatment Performed - Jet Perforation
1980-09-01 Perforation Treatment Performed - Fractured
1980-09-06 Perforation Treatment Performed - Jet Perforation
1980-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-29 Well Began Production
1980-10-29 Well Fluid changed to Crude Oil
1980-10-29 Well Mode changed to Pumping
1983-06-08 Well Fluid changed to Crude Oil
1983-06-08 Well Mode changed to Suspended
2004-10-01 Well Fluid changed to Crude Oil
2004-10-01 Well Mode changed to Pumping
2009-10-01 Well Fluid changed to Crude Oil
2009-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-08-30 Perforation 1974.20 1977.00 13
1980-08-30 Perforation 1984.80 1985.60 13
1980-09-01 Fracture 1974.20 1985.60 0
1980-09-06 Perforation 2164.00 2180.00 14
1980-09-10 Acid Treatment 2164.00 2180.00 0
1980-09-16 Acid Treatment 1974.20 1985.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1371 0.0 0.0 0.0
1981 6990 0.0 0.0 0.0
1982 6754 0.0 0.0 0.0
1983 2179 0.0 0.0 0.0
2004 2136 0.0 0.0 0.0
2005 4248 0.0 0.0 0.0
2006 8359 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 7970 0.0 0.0 0.0

For data sources see[5]

References