X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565192806000

Well Details

Well ID: 0565192806000
Loading map...
Location: 00/06-28-056-19W5/0
Location Alias: 00/06-28-56-19 W5M
Location Alias 2: 00/06-28-056-19 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 19
Section: 28
County/Municipality: Yellowhead County
Well Name: SOC PINE CK 6-28-56-19
Operator Name: AlphaBow Energy Ltd.
License Number: 0055896
License Date: 1975-11-21
License Status: Suspension
Spud Date: 1975-11-24
Final Drill Date: 1975-12-20
Well Total Depth: 2589.30 m
Surface Hole Latitude: 53.865674
Surface Hole Longitude: -116.768236

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-21 Obtained License
1975-12-13 Drill Stem Test Performed
1975-12-17 Drill Stem Test Performed
1975-12-20 Finished Drilling
1975-12-20 Well Mode changed to Drilled and Cased
1975-12-22 Production Casing Operation Performed
1976-01-15 Perforation Treatment Performed - Jet Perforation
1976-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-17 Perforation Treatment Performed - Jet Perforation
1976-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-01-21 Perforation Treatment Performed - Jet Perforation
1976-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-24 Perforation Treatment Performed - Fractured
1976-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-02-02 Perforation Treatment Performed - Jet Perforation
1976-02-17 Well Began Production
1976-02-17 Well Fluid changed to Crude Oil
1976-02-17 Well Mode changed to Flowing
1991-03-23 Perforation Treatment Performed - Jet Perforation
1991-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-01-01 Well Fluid changed to Crude Oil
2004-01-01 Well Mode changed to Pumping
2012-08-01 Well Fluid changed to Crude Oil
2012-08-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-01-15 Perforation 2575.90 2577.40 10
1976-01-23 Acid Treatment 2354.30 2369.80 0
1976-01-24 Fracture 2354.30 2369.80 0
1976-02-02 Packing Device Capped w/Cement 2331.70 2331.70 0
1976-02-02 Perforation 2173.20 2175.40 7
1976-02-02 Perforation 2178.10 2179.90 7
1991-03-23 Perforation 2155.00 2158.00 13
1991-03-23 Perforation 2173.00 2175.50 13
1991-03-23 Perforation 2178.00 2180.00 13
1991-03-23 Perforation 2182.20 2183.70 13
1991-03-24 Acid Treatment 2155.00 2183.70 0
1976-01-16 Packing Device Capped w/Cement 2567.90 2572.50 0
1976-01-17 Perforation 2546.30 2549.30 13
1976-01-17 Acid Treatment 2546.30 2549.30 0
1976-01-19 Packing Device Capped w/Cement 2539.00 2539.00 0
1976-01-21 Perforation 2354.30 2359.20 13
1976-01-21 Perforation 2359.20 2361.90 7
1976-01-21 Perforation 2361.90 2365.60 13
1976-01-21 Perforation 2365.60 2369.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 809 0.0 0.0 0.0
1977 1254 0.0 0.0 0.0
1978 1318 0.0 0.0 0.0
1979 1461 0.0 0.0 0.0
1980 2001 0.0 0.0 0.0
1981 2363 0.0 0.0 0.0
1982 4525 0.0 0.0 0.0
1983 5069 0.0 0.0 0.0
1984 1810 0.0 0.0 0.0
1985 7593 0.0 0.0 0.0
1986 8537 0.0 0.0 0.0
1987 8405 0.0 0.0 0.0
1988 8406 0.0 0.0 0.0
1989 1824 0.0 0.0 0.0
1991 5962 0.0 0.0 0.0
1992 8376 0.0 0.0 0.0
1993 8029 0.0 0.0 0.0
1994 8756 0.0 0.0 0.0
1995 7824 0.0 0.0 0.0
1996 8395 0.0 0.0 0.0
1997 6887 0.0 0.0 0.0
1998 2129 0.0 0.0 0.0
1999 3820 0.0 0.0 0.0
2000 7107 0.0 0.0 0.0
2001 6456 0.0 0.0 0.0
2002 7536 0.0 0.0 0.0
2003 6168 0.0 0.0 0.0
2004 7711 0.0 0.0 0.0
2005 3404 0.0 0.0 0.0
2006 8287 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8677 0.0 0.0 0.0
2009 6148 0.0 0.0 0.0

For data sources see[5]

References