If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0565192813003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.872564,"lon":-116.770487,"icon":""}]} |
Location: 00/13-28-056-19W5/3 | |
Location Alias: 00/13-28-56-19 W5M | |
Location Alias 2: 00/13-28-056-19 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 5 | |
Range: 19 | |
Section: 28 | |
County/Municipality: Yellowhead County | |
Well Name: CABRE PINE CREEK 13-28-56-19 | |
Operator Name: Enerplus Corporation | |
License Number: 0242203 | |
License Date: 2000-09-18 | |
License Status: Issued | |
Spud Date: 2000-09-29 | |
Final Drill Date: 2000-09-30 | |
Well Total Depth: 2825.10 m | |
Surface Hole Latitude: 53.872564 | |
Surface Hole Longitude: -116.770487 |
Date | Event |
---|---|
2000-09-18 | Obtained License |
2000-09-30 | Finished Drilling |
2000-09-30 | Perforation Treatment Performed - Jet Perforation |
2000-09-30 | Well Mode changed to Drilled and Cased |
2000-10-01 | Well Log Performed |
2000-10-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-10-02 | Perforation Treatment Performed - Cement Squeeze |
2000-10-02 | Plug Back Performed |
2000-10-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-10-06 | Well Log Performed |
2000-10-07 | Perforation Treatment Performed - Jet Perforation |
2000-10-07 | Well Log Performed |
2000-10-15 | Rig Released |
2001-03-20 | Well Began Production |
2001-03-20 | Well Fluid changed to Gas |
2001-03-20 | Well Mode changed to Flowing |
2009-10-24 | Perforation Treatment Performed - Jet Perforation |
2009-10-24 | Well Fluid changed to Gas |
2009-10-24 | Well Log Performed |
2009-10-24 | Well Mode changed to Flowing |
2009-10-29 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-09-30 | Perforation | 2505.00 | 2519.00 | 13 |
2000-10-02 | Acid Treatment | 2505.00 | 2519.00 | 0 |
2000-10-02 | Cement Squeeze | 2505.00 | 2519.00 | 0 |
2000-10-06 | Packing Device Capped w/Cement | 2792.00 | 2800.00 | 0 |
2000-10-07 | Perforation | 2763.00 | 2770.00 | 17 |
2009-10-24 | Perforation | 2685.00 | 2691.00 | 17 |
2009-10-29 | Fracture | 2685.00 | 2691.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 3960 | 0.0 | 0.0 | 0.0 |
2002 | 2012 | 0.0 | 0.0 | 0.0 |
2003 | 5621 | 0.0 | 0.0 | 0.0 |
2004 | 6629 | 0.0 | 0.0 | 0.0 |
2005 | 7861 | 0.0 | 0.0 | 0.0 |
2006 | 6979 | 0.0 | 0.0 | 0.0 |
2007 | 7399 | 0.0 | 0.0 | 0.0 |
2008 | 7742 | 0.0 | 0.0 | 0.0 |
2009 | 7357 | 0.0 | 0.0 | 0.0 |
2010 | 5864 | 0.0 | 0.0 | 0.0 |
2011 | 6746 | 0.0 | 0.0 | 0.0 |
2012 | 7163 | 0.0 | 0.0 | 0.0 |
2013 | 7340 | 0.0 | 0.0 | 0.0 |
2014 | 5950 | 0.0 | 0.0 | 0.0 |
2015 | 7985 | 0.0 | 0.0 | 0.0 |
2016 | 7469 | 0.0 | 0.0 | 0.0 |
2017 | 8182 | 0.0 | 0.0 | 0.0 |
2018 | 5585 | 0.0 | 0.0 | 0.0 |
2019 | 6723 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]