X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565193116002

Well Details

Well ID: 0565193116002
Loading map...
Location: 00/16-31-056-19W5/2
Location Alias: 00/16-31-56-19 W5M
Location Alias 2: 00/16-31-056-19 W5/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 19
Section: 31
County/Municipality: Yellowhead County
Well Name: SOC PINE CK 16-31-56-19
Operator Name: AlphaBow Energy Ltd.
License Number: 0182230
License Date: 1995-11-17
License Status: Issued
Spud Date: 1995-12-01
Final Drill Date: 1996-01-05
Well Total Depth: 3017.00 m
Surface Hole Latitude: 53.886897
Surface Hole Longitude: -116.806346

For data sources see[1][2]

Well History

Date Event
1995-11-17 Obtained License
1995-12-01 Lost Circulation Occurred
1995-12-03 Surface Casing Operation Performed
1995-12-21 Lost Circulation Occurred
1996-01-05 Finished Drilling
1996-01-05 Well Mode changed to Drilled and Cased
1996-01-06 Well Log Performed
1996-01-09 Production Casing Operation Performed
1996-01-10 Rig Released
1996-01-24 Well Log Performed
1996-01-25 Perforation Treatment Performed - Jet Perforation
1996-01-25 Well Log Performed
1996-02-04 Perforation Treatment Performed - Fractured
1996-02-08 Well Log Performed
1996-02-18 Well Log Performed
1996-02-19 Perforation Treatment Performed - Jet Perforation
1996-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-17 Plug Back Performed
1999-11-19 Perforation Treatment Performed - Jet Perforation
1999-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-21 Perforation Treatment Performed - Jet Perforation
1999-11-21 Plug Back Performed
1999-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-23 Perforation Treatment Performed - Jet Perforation
1999-11-23 Plug Back Performed
1999-11-23 Well Mode changed to Drilled and Cased
1999-12-02 Perforation Treatment Performed - Fractured
2000-01-12 Well Began Production
2000-01-12 Well Fluid changed to Crude Oil
2000-01-12 Well Mode changed to Flowing
2004-01-01 Well Fluid changed to Crude Oil
2004-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-01-25 Perforation 2922.00 2929.70 13
1999-11-23 Perforation 2142.50 2146.50 17
1999-11-23 Perforation 2161.00 2164.00 17
1999-12-02 Fracture 2142.50 2164.00 0
1996-02-04 Fracture 2922.00 2929.70 0
1996-02-19 Perforation 2904.00 2911.00 13
1996-02-25 Acid Treatment 2904.00 2911.00 0
1999-11-17 Packing Device Capped w/Cement 2892.00 2900.00 0
1999-11-19 Perforation 2852.00 2858.00 17
1999-11-21 Packing Device Capped w/Cement 2840.00 2848.00 0
1999-11-21 Perforation 2348.00 2366.00 17
1999-11-23 Packing Device Capped w/Cement 2336.00 2344.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 8303 0.0 0.0 0.0
2001 7584 0.0 0.0 0.0
2002 8543 0.0 0.0 0.0
2003 8351 0.0 0.0 0.0
2004 8311 0.0 0.0 0.0
2005 8691 0.0 0.0 0.0
2006 8758 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8321 0.0 0.0 0.0
2010 8446 0.0 0.0 0.0
2011 8469 0.0 0.0 0.0
2012 8079 0.0 0.0 0.0
2013 7703 0.0 0.0 0.0
2014 7916 0.0 0.0 0.0
2015 8463 0.0 0.0 0.0
2016 8770 0.0 0.0 0.0
2017 7429 0.0 0.0 0.0
2018 4638 0.0 0.0 0.0
2019 2737 0.0 0.0 0.0
2020 1050 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1995-12-01 Lost Circulation 51.00 154.00
1995-12-21 Lost Circulation 2390.00 2390.00

For data sources see[6]

References