If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0565200509002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.810249,"lon":-116.925856,"icon":""}]} |
Location: 00/09-05-056-20W5/2 | |
Location Alias: 00/09-05-56-20 W5M | |
Location Alias 2: 00/09-05-056-20 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 5 | |
Range: 20 | |
Section: 05 | |
County/Municipality: Yellowhead County | |
Well Name: AMOCO NOSEHILL 9-5-56-20 | |
Operator Name: Plains Midstream Canada ULC | |
License Number: 0065019 | |
License Date: 1977-07-29 | |
License Status: Re-Entered | |
Spud Date: 1977-11-08 | |
Final Drill Date: 1978-01-26 | |
Well Total Depth: 4174.20 m | |
Surface Hole Latitude: 53.810249 | |
Surface Hole Longitude: -116.925856 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-07-29 | Obtained License |
1977-11-08 | Lost Circulation Occurred |
1977-12-04 | Drill Stem Test Performed |
1977-12-17 | Drill Stem Test Performed |
1978-01-08 | Drill Stem Test Performed |
1978-01-09 | Drill Stem Test Performed |
1978-01-17 | Drill Stem Test Performed |
1978-01-19 | Drill Stem Test Performed |
1978-01-20 | Drill Stem Test Performed |
1978-01-26 | Finished Drilling |
1978-01-31 | Drill Stem Test Performed |
1978-02-01 | Drill Stem Test Performed |
1978-08-31 | Perforation Treatment Performed - Jet Perforation |
1978-09-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-01-20 | Perforation Treatment Performed - Jet Perforation |
1980-01-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-01-28 | Perforation Treatment Performed - Jet Perforation |
1980-02-03 | Perforation Treatment Performed - Fractured |
1980-02-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-02-06 | Perforation Treatment Performed - Jet Perforation |
1980-02-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-02-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-02-12 | Perforation Treatment Performed - Jet Perforation |
1980-02-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-02-14 | Perforation Treatment Performed - Cement Squeeze |
1980-02-19 | Perforation Treatment Performed - Jet Perforation |
1980-02-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-02-22 | Perforation Treatment Performed - Fractured |
1980-02-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-02-28 | Perforation Treatment Performed - Jet Perforation |
1980-03-02 | Perforation Treatment Performed - Fractured |
1980-03-20 | Well Mode changed to Drilled and Cased |
1984-10-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-10-04 | Plug Back Performed |
1984-10-04 | Well Mode changed to Abandoned and Re-entered |
1984-10-06 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-08-31 | Perforation | 3897.50 | 3903.30 | 3 |
1980-02-09 | Acid Treatment | 3649.70 | 3667.70 | 0 |
1980-02-11 | Packing Device Capped w/Cement | 3631.00 | 3639.00 | 0 |
1980-02-12 | Perforation | 2993.10 | 3000.80 | 7 |
1980-02-13 | Acid Treatment | 2993.10 | 3000.80 | 0 |
1980-02-14 | Cement Squeeze | 2993.10 | 3000.80 | 0 |
1980-02-19 | Perforation | 2980.90 | 2987.00 | 13 |
1980-02-20 | Acid Treatment | 2980.90 | 2987.00 | 0 |
1980-02-22 | Fracture | 2980.90 | 2987.00 | 0 |
1980-02-25 | Packing Device Capped w/Cement | 2965.00 | 2965.00 | 0 |
1980-02-28 | Perforation | 2160.40 | 2166.50 | 13 |
1978-09-01 | Acid Treatment | 3897.50 | 3903.30 | 0 |
1980-03-02 | Fracture | 2160.40 | 2166.50 | 0 |
1984-10-04 | Packing Device Capped w/Cement | 2147.00 | 2155.00 | 0 |
1980-01-20 | Perforation | 3888.00 | 3890.80 | 7 |
1980-01-22 | Acid Treatment | 3888.00 | 3890.80 | 0 |
1980-01-28 | Perforation | 3870.10 | 3874.90 | 7 |
1980-01-28 | Perforation | 3875.80 | 3878.00 | 7 |
1980-02-03 | Fracture | 3870.10 | 3878.00 | 0 |
1980-02-06 | Packing Device Capped w/Cement | 3858.00 | 3858.00 | 0 |
1980-02-06 | Perforation | 3649.70 | 3667.70 | 7 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1977-11-08 | Lost Circulation | 115.00 | 153.00 |
For data sources see[5]