X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565202114023

Well Details

Well ID: 0565202114023
Loading map...
Location: 02/14-21-056-20W5/3
Location Alias: 02/14-21-56-20 W5M
Location Alias 2: 02/14-21-056-20 W5/03
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 20
Section: 21
County/Municipality: Yellowhead County
Well Name: GPI 102 PINE 14-21-56-20
Operator Name: Harvest Operations Corp.
License Number: 0352554
License Date: 2006-02-22
License Status: Suspension
Spud Date: 2006-04-29
Final Drill Date: 2006-05-16
Well Total Depth: 2520.00 m
Surface Hole Latitude: 53.858561
Surface Hole Longitude: -116.916492

For data sources see[1][2]

Well History

Date Event
2006-02-22 Obtained License
2006-05-02 Surface Casing Operation Performed
2006-05-16 Finished Drilling
2006-05-16 Well Log Performed
2006-05-16 Well Mode changed to Drilled and Cased
2006-05-18 Drill Stem Test Performed
2006-05-20 Drill Stem Test Performed
2006-05-22 Production Casing Operation Performed
2006-05-22 Rig Released
2006-06-03 Perforation Treatment Performed - Jet Perforation
2006-06-03 Well Log Performed
2006-06-04 Perforation Treatment Performed - Fractured
2006-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-07 Plug Back Performed
2006-06-09 Perforation Treatment Performed - Jet Perforation
2006-06-09 Well Log Performed
2006-06-12 Perforation Treatment Performed - Fractured
2006-06-25 Perforation Treatment Performed - Cement Squeeze
2006-06-25 Plug Back Performed
2006-06-28 Perforation Treatment Performed - Jet Perforation
2006-06-28 Well Log Performed
2006-06-29 Perforation Treatment Performed - Fractured
2009-10-06 Well Began Production
2009-10-06 Well Fluid changed to Gas
2009-10-06 Well Mode changed to Flowing
2015-11-15 Well Fluid changed to Gas
2015-11-15 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-06-03 Perforation 2432.50 2435.00 20
2006-06-29 Fracture 2027.00 2032.00 0
2006-06-04 Fracture 2432.50 2435.00 0
2006-06-07 Packing Device Capped w/Cement 2417.00 2425.00 0
2006-06-09 Perforation 1584.00 1586.00 20
2006-06-09 Perforation 1590.00 1593.50 20
2006-06-12 Fracture 1584.00 1586.00 0
2006-06-12 Fracture 1590.00 1593.50 0
2006-06-25 Cement Squeeze 1584.00 1593.50 0
2006-06-28 Perforation 2027.00 2032.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 2112 0.0 0.0 0.0
2010 7343 0.0 0.0 0.0
2011 3695 0.0 0.0 0.0
2012 7775 0.0 0.0 0.0
2013 7512 0.0 0.0 0.0
2014 5619 0.0 0.0 0.0
2015 2641 0.0 0.0 0.0

For data sources see[5]

References