X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565202307002

Well Details

Well ID: 0565202307002
Loading map...
Location: 00/07-23-056-20W5/2
Location Alias: 00/07-23-56-20 W5M
Location Alias 2: 00/07-23-056-20 W5/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 20
Section: 23
County/Municipality: Yellowhead County
Well Name: SOC PINE CK 7-23-56-20
Operator Name: AlphaBow Energy Ltd.
License Number: 0085181
License Date: 1980-08-25
License Status: Suspension
Spud Date: 1980-10-15
Final Drill Date: 1981-03-02
Well Total Depth: 3980.00 m
Surface Hole Latitude: 53.850907
Surface Hole Longitude: -116.859537

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-25 Obtained License
1980-10-15 Lost Circulation Occurred
1980-10-20 Lost Circulation Occurred
1980-12-24 Drill Stem Test Performed
1981-02-17 Production Casing Operation Performed
1981-03-02 Finished Drilling
1982-03-08 Perforation Treatment Performed - Jet Perforation
1982-03-17 Perforation Treatment Performed - Cement Plug
1982-03-18 Perforation Treatment Performed - Cement Plug
1982-03-18 Perforation Treatment Performed - Jet Perforation
1982-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-19 Perforation Treatment Performed - Cement Squeeze
1982-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-21 Perforation Treatment Performed - Jet Perforation
1982-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-25 Perforation Treatment Performed - Cement Squeeze
1982-03-26 Perforation Treatment Performed - Jet Perforation
1982-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-27 Perforation Treatment Performed - Jet Perforation
1982-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-28 Perforation Treatment Performed - Cement Squeeze
1982-06-03 Perforation Treatment Performed - Jet Perforation
1982-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-06 Perforation Treatment Performed - Fractured
1982-06-09 Perforation Treatment Performed - Cement Squeeze
1982-06-10 Perforation Treatment Performed - Jet Perforation
1982-06-12 Perforation Treatment Performed - Fractured
1982-09-23 Perforation Treatment Performed - Jet Perforation
1982-09-26 Perforation Treatment Performed - Fractured
1982-10-01 Well Mode changed to Drilled and Cased
1993-07-01 Well Began Production
1993-07-01 Well Fluid changed to Crude Oil
1993-07-01 Well Mode changed to Flowing
1996-07-30 Well Fluid changed to Crude Oil
1996-07-30 Well Mode changed to Suspended
1996-10-16 Well Fluid changed to Crude Oil
1996-10-16 Well Mode changed to Flowing
2004-01-01 Well Fluid changed to Crude Oil
2004-01-01 Well Mode changed to Pumping
2012-10-01 Well Fluid changed to Crude Oil
2012-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-03-08 Perforation 3002.00 3008.00 7
1982-03-21 Acid Treatment 2654.00 2657.00 0
1982-03-22 Acid Treatment 2654.00 2657.00 0
1982-03-25 Cement Squeeze 2654.00 2657.00 0
1982-03-26 Perforation 2464.30 2465.00 7
1982-03-27 Acid Treatment 2464.30 2465.00 0
1982-03-27 Perforation 2451.30 2452.00 7
1982-03-28 Acid Treatment 2464.30 2465.00 0
1982-03-28 Cement Squeeze 2451.30 2465.00 0
1982-06-03 Perforation 2437.00 2454.00 3
1982-06-04 Acid Treatment 2437.00 2454.00 0
1982-03-17 Cement Plug 2988.00 2996.00 0
1982-06-06 Fracture 2437.00 2454.00 0
1982-06-09 Cement Squeeze 2437.00 2454.00 0
1982-06-10 Perforation 2241.00 2243.00 7
1982-06-12 Fracture 2241.00 2243.00 0
1982-09-23 Perforation 2225.00 2228.00 7
1982-09-26 Fracture 2225.00 2228.00 0
1982-03-18 Cement Plug 2983.50 2988.00 0
1982-03-18 Cement Plug 2979.00 2983.50 0
1982-03-18 Perforation 2670.00 2670.60 13
1982-03-18 Perforation 2644.30 2645.00 13
1982-03-19 Acid Treatment 2644.30 2670.60 0
1982-03-19 Cement Squeeze 2644.30 2670.60 0
1982-03-21 Perforation 2654.00 2657.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2335 0.0 0.0 0.0
1994 720 0.0 0.0 0.0
1996 4368 0.0 0.0 0.0
1997 6149 0.0 0.0 0.0
1998 6939 0.0 0.0 0.0
1999 7656 0.0 0.0 0.0
2000 6706 0.0 0.0 0.0
2001 7608 0.0 0.0 0.0
2002 8592 0.0 0.0 0.0
2003 7511 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8758 0.0 0.0 0.0
2006 8756 0.0 0.0 0.0
2007 8741 0.0 0.0 0.0
2008 8220 0.0 0.0 0.0
2009 3935 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-10-15 Lost Circulation 17.80 25.90
1980-10-20 Lost Circulation 387.20 450.00

For data sources see[6]

References