X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565230508024

Well Details

Well ID: 0565230508024
Loading map...
Location: 02/08-05-056-23W5/4
Location Alias: 02/08-05-56-23 W5M
Location Alias 2: 02/08-05-056-23 W5/04
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 23
Section: 05
County/Municipality: Yellowhead County
Well Name: TALISMAN 102 WILD RIV 8-5-56-23
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0436659
License Date: 2011-09-08
License Status: Issued
Spud Date: 2012-01-29
Final Drill Date: 2012-02-09
Well Total Depth: 3187.00 m
Surface Hole Latitude: 53.806614
Surface Hole Longitude: -117.369649

For data sources see[1][2]

Well History

Date Event
2011-09-08 Obtained License
2012-02-01 Surface Casing Operation Performed
2012-02-03 Direction Drilling Operation Performed - Deviate
2012-02-09 Finished Drilling
2012-02-09 Well Log Performed
2012-02-09 Well Mode changed to Drilled and Cased
2012-02-10 Well Log Performed
2012-02-11 Production Casing Operation Performed
2012-02-11 Rig Released
2012-02-26 Perforation Treatment Performed - Jet Perforation
2012-02-29 Perforation Treatment Performed - Fractured
2012-02-29 Perforation Treatment Performed - Jet Perforation
2012-03-01 Perforation Treatment Performed - Fractured
2012-03-02 Perforation Treatment Performed - Fractured
2012-03-02 Perforation Treatment Performed - Jet Perforation
2012-03-03 Perforation Treatment Performed - Fractured
2012-03-03 Perforation Treatment Performed - Jet Perforation
2012-03-04 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-02-03 1558.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-26 Perforation 3157.40 3157.70 20
2012-03-02 Perforation 2809.40 2809.70 20
2012-03-02 Perforation 2815.00 2815.30 20
2012-03-02 Fracture 2847.00 2946.80 0
2012-03-02 Perforation 2781.00 2781.30 20
2012-03-02 Perforation 2797.00 2797.30 20
2012-03-02 Perforation 2804.40 2804.70 20
2012-03-02 Perforation 2847.00 2847.10 20
2012-03-02 Perforation 2918.00 2918.30 20
2012-03-02 Perforation 2939.70 2939.80 20
2012-03-02 Perforation 2946.70 2946.80 20
2012-02-26 Perforation 3149.00 3149.30 20
2012-03-02 Perforation 2851.70 2851.80 20
2012-03-02 Perforation 2893.00 2893.10 20
2012-03-02 Perforation 2901.70 2901.80 20
2012-03-03 Perforation 2666.00 2666.60 20
2012-03-03 Perforation 2657.00 2657.60 20
2012-03-03 Perforation 2669.20 2669.80 20
2012-03-03 Fracture 2797.00 2815.30 0
2012-03-03 Fracture 2781.00 2781.30 0
2012-03-04 Fracture 2657.00 2669.80 0
2012-02-26 Perforation 3169.00 3169.30 20
2012-02-26 Perforation 3164.40 3164.70 20
2012-02-29 Perforation 3037.00 3037.70 20
2012-02-29 Perforation 3032.00 3032.70 20
2012-02-29 Fracture 3149.00 3169.30 0
2012-02-29 Perforation 3041.00 3041.70 20
2012-03-01 Fracture 3032.00 3041.70 0

For data sources see[5]



References