X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565231507002

Well Details

Well ID: 0565231507002
Loading map...
Location: 00/07-15-056-23W5/2
Location Alias: 00/07-15-56-23 W5M
Location Alias 2: 00/07-15-056-23 W5/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 23
Section: 15
County/Municipality: Yellowhead County
Well Name: TALISMAN ET AL WILD RIVER 7-15-56-23
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0084569
License Date: 1980-07-30
License Status: Issued
Spud Date: 1980-08-28
Final Drill Date: 1980-10-10
Well Total Depth: 3205.00 m
Surface Hole Latitude: 53.836366
Surface Hole Longitude: -117.330151

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-30 Obtained License
1980-10-10 Finished Drilling
1980-10-10 Well Log Performed
1980-10-15 Production Casing Operation Performed
1980-11-20 Perforation Treatment Performed - Jet Perforation
1980-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-23 Perforation Treatment Performed - Fractured
1980-11-30 Perforation Treatment Performed - Jet Perforation
1980-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-04 Perforation Treatment Performed - Fractured
1980-12-17 Well Mode changed to Drilled and Cased
1980-12-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-01 Well Began Production
1994-11-01 Well Fluid changed to Gas
1994-11-01 Well Mode changed to Flowing
1994-11-08 Well Fluid changed to Gas
1994-11-08 Well Mode changed to Suspended
1995-02-05 Well Fluid changed to Gas
1995-02-05 Well Mode changed to Flowing
1995-02-06 Well Structure changed to Commingled
2007-09-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-20 Perforation 2941.00 2944.50 13
1980-11-21 Acid Treatment 2941.00 2944.50 0
1980-11-23 Fracture 2941.00 2944.50 0
1980-11-30 Perforation 2693.30 2696.50 13
1980-12-02 Acid Treatment 2693.30 2696.50 0
1980-12-04 Fracture 2693.30 2696.50 0
1980-12-23 Acid Treatment 2941.00 2944.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 90 0.0 0.0 0.0
1994 408 0.0 0.0 0.0

For data sources see[5]

References