X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574010411000

Well Details

Well ID: 0574010411000
Loading map...
Location: 00/11-04-057-01W4/0
Location Alias: 00/11-04-57-01 W4M
Location Alias 2: 00/11-04-057-01 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 01
Section: 04
County/Municipality: Fishing Lake Metis Settlement
Well Name: CNRES 11B FROG LAKE 11-4-57-1
Operator Name: Canadian Natural Resources Limited
License Number: 0281418
License Date: 2003-01-23
License Status: Suspension
Spud Date: 2003-04-09
Final Drill Date: 2003-04-14
Well Total Depth: 776.00 m
Surface Hole Latitude: 53.895907
Surface Hole Longitude: -110.091013

For data sources see[1][2]

Well History

Date Event
2003-01-23 Obtained License
2003-04-09 Direction Drilling Operation Performed - Deviate
2003-04-11 Surface Casing Operation Performed
2003-04-14 Finished Drilling
2003-04-14 Well Log Performed
2003-04-14 Well Mode changed to Drilled and Cased
2003-04-15 Production Casing Operation Performed
2003-04-15 Rig Released
2003-05-03 Well Log Performed
2003-05-23 Well Log Performed
2003-05-24 Perforation Treatment Performed - Jet Perforation
2003-05-27 Well Began Production
2003-05-27 Well Fluid changed to Crude Bitumen
2003-05-27 Well Mode changed to Pumping
2013-06-30 Well Fluid changed to Crude Bitumen
2013-06-30 Well Mode changed to Suspended
2016-07-20 Perforation Treatment Performed - Jet Perforation
2016-07-20 Well Log Performed
2019-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-13 Plug Back Performed
2019-09-14 Perforation Treatment Performed - Jet Perforation
2019-09-14 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-04-09 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-05-24 Perforation 640.50 643.50 26
2016-07-20 Perforation 671.70 674.20 26
2019-09-13 Packing Device Capped w/Cement 643.50 669.00 0
2019-09-14 Perforation 631.00 634.50 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 5268 0.0 0.0 0.0
2004 8047 0.0 0.0 0.0
2005 7759 0.0 0.0 0.0
2006 5062 0.0 0.0 0.0
2007 7469 0.0 0.0 0.0
2008 7569 0.0 0.0 0.0
2009 6023 0.0 0.0 0.0
2010 7487 0.0 0.0 0.0
2011 8228 0.0 0.0 0.0
2012 3744 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-07-21 No Incident Encountered 0.00 0.00
2019-09-15 No Incident Encountered 0.00 0.00

For data sources see[7]

References