If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0574010902022 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 02/02-09-057-01W4/2 | |
Location Alias: 02/02-09-57-01 W4M | |
Location Alias 2: 02/02-09-057-01 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 4 | |
Range: 01 | |
Section: 09 | |
County/Municipality: Fishing Lake Metis Settlement | |
Well Name: CNRES 2C FROG LAKE 2-9-57-1 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0224326 | |
License Date: 1999-07-09 | |
License Status: Suspension | |
Spud Date: 1998-08-06 | |
Final Drill Date: 1999-08-19 | |
Well Total Depth: 622.00 m | |
Surface Hole Latitude: 53.905516 | |
Surface Hole Longitude: -110.089941 |
Date | Event |
---|---|
1999-07-09 | Obtained License |
1999-08-06 | Direction Drilling Operation Performed - Deviate |
1999-08-06 | Surface Casing Operation Performed |
1999-08-19 | Finished Drilling |
1999-08-19 | Well Log Performed |
1999-08-19 | Well Mode changed to Drilled and Cased |
1999-08-20 | Production Casing Operation Performed |
1999-08-20 | Rig Released |
1999-09-10 | Well Log Performed |
1999-09-11 | Perforation Treatment Performed - Jet Perforation |
1999-10-02 | Well Log Performed |
2001-10-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-10-16 | Plug Back Performed |
2001-10-17 | Perforation Treatment Performed - Jet Perforation |
2001-10-17 | Well Log Performed |
2001-10-18 | Well Began Production |
2001-10-18 | Well Fluid changed to Crude Bitumen |
2001-10-18 | Well Mode changed to Pumping |
2008-06-30 | Well Fluid changed to Crude Bitumen |
2008-06-30 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1999-08-06 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-09-11 | Perforation | 579.50 | 582.50 | 39 |
2001-10-16 | Packing Device Capped w/Cement | 566.50 | 574.50 | 0 |
2001-10-17 | Perforation | 541.00 | 545.00 | 26 |
2001-10-17 | Perforation | 551.00 | 555.00 | 26 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 1800 | 0.0 | 0.0 | 0.0 |
2002 | 8529 | 0.0 | 0.0 | 0.0 |
2003 | 8079 | 0.0 | 0.0 | 0.0 |
2004 | 8297 | 0.0 | 0.0 | 0.0 |
2005 | 8380 | 0.0 | 0.0 | 0.0 |
2006 | 6689 | 0.0 | 0.0 | 0.0 |
For data sources see[6]