0574021215000

Well Details

Well ID: 0574021215000
Loading map...
Location: 00/15-12-057-02W4/0
Location Alias: 00/15-12-57-02 W4M
Location Alias 2: 00/15-12-057-02 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 02
Section: 12
County/Municipality: Fishing Lake Metis Settlement
Well Name: CNRL JOHN LAKE 15-12-57-2
Operator Name: Canadian Natural Resources Limited
License Number: 0109417
License Date: 1984-09-20
License Status: Suspension
Spud Date: 1984-10-24
Final Drill Date: 1984-10-29
Well Total Depth: 620.00 m
Surface Hole Latitude: 53.916712
Surface Hole Longitude: -110.163399

For data sources see[1][2]

Well History

Date Event
1984-09-20 Obtained License
1984-10-24 Lost Circulation Occurred
1984-10-25 Surface Casing Operation Performed
1984-10-29 Finished Drilling
1984-10-29 Well Log Performed
1984-10-30 Well Log Performed
1984-10-31 Production Casing Operation Performed
1984-10-31 Rig Released
1984-10-31 Well Mode changed to Drilled and Cased
1985-08-08 Perforation Treatment Performed - Jet Perforation
1985-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-09-20 Perforation Treatment Performed - Jet Perforation
1985-09-20 Plug Back Performed
1985-09-21 Well Began Production
1985-09-21 Well Fluid changed to Crude Bitumen
1985-09-21 Well Mode changed to Pumping
1985-10-22 Well Fluid changed to Crude Bitumen
1985-10-22 Well Mode changed to Suspended
1988-08-25 Well Fluid changed to Crude Bitumen
1988-08-25 Well Mode changed to Pumping
1988-10-05 Perforation Treatment Performed - Cement Squeeze
1988-10-05 Plug Back Performed
1988-10-11 Perforation Treatment Performed - Jet Perforation
1991-02-13 Well Fluid changed to Crude Bitumen
1991-02-13 Well Mode changed to Suspended
1995-02-15 Well Fluid changed to Crude Bitumen
1995-02-15 Well Mode changed to Pumping
2001-11-30 Well Fluid changed to Crude Bitumen
2001-11-30 Well Mode changed to Suspended
2002-03-11 Well Fluid changed to Crude Bitumen
2002-03-11 Well Mode changed to Pumping
2002-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-13 Plug Back Performed
2002-03-13 Well Fluid changed to Crude Bitumen
2002-03-13 Well Mode changed to Abandoned Zone
2002-03-14 Perforation Treatment Performed - Jet Perforation
2002-04-07 Perforation Treatment Performed - Jet Perforation
2011-05-18 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-08-08 Perforation 554.00 557.00 13
1985-09-20 Packing Device Capped w/Cement 542.00 545.00 0
1985-09-20 Perforation 446.00 450.50 13
1988-10-05 Cement Squeeze 446.00 450.50 0
1988-10-11 Perforation 554.00 557.00 13
2002-03-13 Packing Device Capped w/Cement 542.00 550.00 0
2002-03-14 Perforation 445.00 450.00 26
2002-04-07 Perforation 427.00 434.00 26
2011-05-18 Perforation 435.50 439.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 576 0.0 0.0 0.0
1989 3518 0.0 0.0 0.0
1990 8335 0.0 0.0 0.0
1991 1006 0.0 0.0 0.0
1995 7396 0.0 0.0 0.0
1996 8012 0.0 0.0 0.0
1997 6424 0.0 0.0 0.0
1999 7028 0.0 0.0 0.0
2000 8107 0.0 0.0 0.0
2001 936 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-10-24 Lost Circulation 0.10 0.10

For data sources see[6]

References