If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0574030811000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.915127,"lon":-110.413178,"icon":""}]} |
Location: 00/11-08-057-03W4/0 | |
Location Alias: 00/11-08-57-03 W4M | |
Location Alias 2: 00/11-08-057-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 4 | |
Range: 03 | |
Section: 08 | |
County/Municipality: Unipouheos 121 | |
Well Name: HNHX 11D FROG LK 11-8-57-3 | |
Operator Name: West Lake Energy Corp. | |
License Number: 0408592 | |
License Date: 2009-01-26 | |
License Status: Suspension | |
Spud Date: 2009-08-31 | |
Final Drill Date: 2009-09-02 | |
Well Total Depth: 570.00 m | |
Surface Hole Latitude: 53.915127 | |
Surface Hole Longitude: -110.413178 |
Date | Event |
---|---|
2009-01-26 | Obtained License |
2009-09-01 | Direction Drilling Operation Performed - Deviate |
2009-09-01 | Surface Casing Operation Performed |
2009-09-02 | Finished Drilling |
2009-09-02 | Well Mode changed to Drilled and Cased |
2009-09-03 | Production Casing Operation Performed |
2009-09-03 | Rig Released |
2009-09-03 | Well Log Performed |
2009-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-09-14 | Perforation Treatment Performed - Jet Perforation |
2009-09-15 | Well Began Production |
2009-09-15 | Well Fluid changed to Crude Bitumen |
2009-09-15 | Well Mode changed to Pumping |
2019-08-01 | Well Fluid changed to Crude Bitumen |
2019-08-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-09-01 | 129.40 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-09-14 | Packing Device Capped w/Cement | 550.40 | 553.40 | 0 |
2009-09-14 | Perforation | 538.50 | 542.00 | 26 |
2009-09-14 | Perforation | 534.50 | 537.00 | 26 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 2208 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8687 | 0.0 | 0.0 | 0.0 |
2012 | 8567 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8684 | 0.0 | 0.0 | 0.0 |
2016 | 8727 | 0.0 | 0.0 | 0.0 |
2017 | 3016 | 0.0 | 0.0 | 0.0 |
For data sources see[6]