X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574031704020

Well Details

Well ID: 0574031704020
Loading map...
Location: 02/04-17-057-03W4/0
Location Alias: 02/04-17-57-03 W4M
Location Alias 2: 02/04-17-057-03 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 03
Section: 17
County/Municipality: Unipouheos 121
Well Name: WLEC 4A FROG LK 4-17-57-3
Operator Name: West Lake Energy Corp.
License Number: 0397624
License Date: 2008-06-16
License Status: Suspension
Spud Date: 2008-07-01
Final Drill Date: 2008-07-03
Well Total Depth: 556.00 m
Surface Hole Latitude: 53.921095
Surface Hole Longitude: -110.423953

For data sources see[1][2]

Well History

Date Event
2008-06-16 Obtained License
2008-07-01 Surface Casing Operation Performed
2008-07-02 Direction Drilling Operation Performed - Deviate
2008-07-03 Finished Drilling
2008-07-03 Lost Circulation Occurred
2008-07-03 Well Mode changed to Drilled and Cased
2008-07-04 Production Casing Operation Performed
2008-07-04 Rig Released
2008-07-04 Well Log Performed
2008-07-14 Perforation Treatment Performed - Jet Perforation
2008-07-15 Well Began Production
2008-07-15 Well Fluid changed to Crude Bitumen
2008-07-15 Well Mode changed to Pumping
2008-09-18 Perforation Treatment Performed - Jet Perforation
2009-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-06 Perforation Treatment Performed - Cement Plug
2009-08-06 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2009-08-06 Plug Back Performed
2009-08-06 Well Fluid changed to Crude Bitumen
2009-08-06 Well Mode changed to Abandoned Zone
2009-08-07 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-07-02 137.80 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-07-14 Perforation 511.00 515.00 26
2008-09-18 Perforation 496.00 500.00 26
2008-09-18 Perforation 480.00 483.00 26
2009-08-06 Cement Plug 515.00 522.60 0
2009-08-06 Packing Device Capped w/Cement 500.00 508.00 0
2009-08-06 Packing Dev Cpd w/Res-Gyp Cem 491.00 494.00 0
2009-08-07 Perforation 435.00 440.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 2480 0.0 0.0 0.0
2009 1200 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-07-03 Lost Circulation 441.00 441.00

For data sources see[7]

References