If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0574161002003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.907152,"lon":-112.290707,"icon":""}]} |
Location: 00/02-10-057-16W4/3 | |
Location Alias: 00/02-10-57-16 W4M | |
Location Alias 2: 00/02-10-057-16 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 4 | |
Range: 16 | |
Section: 10 | |
County/Municipality: Lamont County | |
Well Name: OMERS ENERGY ET AL UKALTA 2-10-57-16 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0329133 | |
License Date: 2005-04-08 | |
License Status: Suspension | |
Spud Date: 2005-07-11 | |
Final Drill Date: 2005-07-13 | |
Well Total Depth: 701.00 m | |
Surface Hole Latitude: 53.907152 | |
Surface Hole Longitude: -112.290707 |
Date | Event |
---|---|
2005-04-08 | Obtained License |
2005-07-11 | Surface Casing Operation Performed |
2005-07-13 | Finished Drilling |
2005-07-13 | Well Log Performed |
2005-07-13 | Well Mode changed to Drilled and Cased |
2005-07-14 | Production Casing Operation Performed |
2005-07-14 | Rig Released |
2005-07-22 | Perforation Treatment Performed - Jet Perforation |
2005-07-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-26 | Perforation Treatment Performed - Jet Perforation |
2005-07-26 | Plug Back Performed |
2007-05-24 | Perforation Treatment Performed - Jet Perforation |
2007-06-08 | Well Began Production |
2007-06-08 | Well Fluid changed to Gas |
2007-06-08 | Well Mode changed to Flowing |
2011-12-01 | Well Fluid changed to Gas |
2011-12-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-07-22 | Perforation | 679.50 | 683.00 | 17 |
2005-07-26 | Packing Device Capped w/Cement | 668.00 | 676.00 | 0 |
2005-07-26 | Perforation | 607.00 | 612.00 | 17 |
2007-05-24 | Perforation | 557.70 | 558.50 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 4928 | 0.0 | 0.0 | 0.0 |
2008 | 8769 | 0.0 | 0.0 | 0.0 |
2009 | 7583 | 0.0 | 0.0 | 0.0 |
2010 | 4416 | 0.0 | 0.0 | 0.0 |
For data sources see[5]