If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0574191306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.92488,"lon":-112.69455,"icon":""}]} |
Location: 00/06-13-057-19W4/0 | |
Location Alias: 00/06-13-57-19 W4M | |
Location Alias 2: 00/06-13-057-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 4 | |
Range: 19 | |
Section: 13 | |
County/Municipality: Lamont County | |
Well Name: ND ET AL SKARO 6-13-57-19 | |
Operator Name: Signalta Resources Limited | |
License Number: 0075046 | |
License Date: 1979-03-23 | |
License Status: RecCertified | |
Spud Date: 1979-07-09 | |
Final Drill Date: 1979-07-13 | |
Well Total Depth: 827.00 m | |
Surface Hole Latitude: 53.924880 | |
Surface Hole Longitude: -112.694550 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-03-23 | Obtained License |
1979-07-11 | Drill Stem Test Performed |
1979-07-13 | Finished Drilling |
1979-07-13 | Well Mode changed to Drilled and Cased |
1979-07-14 | Production Casing Operation Performed |
1979-07-28 | Perforation Treatment Performed - Jet Perforation |
1979-12-07 | Well Began Production |
1979-12-07 | Well Fluid changed to Gas |
1979-12-07 | Well Mode changed to Flowing |
1979-12-15 | Perforation Treatment Performed - Jet Perforation |
1979-12-17 | Perforation Treatment Performed - Jet Perforation |
1980-02-28 | Well Fluid changed to Gas |
1980-02-28 | Well Mode changed to Suspended |
1983-07-05 | Well Log Performed |
1983-07-06 | Well Log Performed |
1983-07-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-07-07 | Perforation Treatment Performed - Jet Perforation |
1983-07-08 | Well Log Performed |
1983-07-09 | Perforation Treatment Performed - Jet Perforation |
1983-07-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-10-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-10-21 | Plug Back Performed |
1987-10-21 | Well Abandoned |
1987-10-21 | Well Fluid changed to Gas |
1987-10-21 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-07-28 | Perforation | 783.60 | 784.80 | 7 |
1987-10-21 | Packing Device Capped w/Cement | 772.00 | 780.00 | 0 |
1979-12-15 | Perforation | 787.00 | 788.50 | 7 |
1979-12-17 | Perforation | 791.80 | 792.80 | 7 |
1983-07-07 | Perforation | 799.00 | 800.00 | 13 |
1983-07-07 | Acid Treatment | 783.60 | 792.80 | 0 |
1983-07-09 | Perforation | 787.60 | 789.10 | 13 |
1983-07-09 | Perforation | 787.00 | 787.60 | 13 |
1983-07-09 | Perforation | 791.80 | 793.30 | 13 |
1983-07-10 | Acid Treatment | 787.00 | 793.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 345 | 0.0 | 0.0 | 0.0 |
For data sources see[5]