If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0574200613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.903044,"lon":-112.973337,"icon":""}]} |
Location: 00/13-06-057-20W4/0 | |
Location Alias: 00/13-06-57-20 W4M | |
Location Alias 2: 00/13-06-057-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 4 | |
Range: 20 | |
Section: 06 | |
County/Municipality: Sturgeon County | |
Well Name: BREVIA007 REDWATER 13-6-57-20 | |
Operator Name: Ohana Resources Inc. | |
License Number: 0003017 | |
License Date: 1951-06-12 | |
License Status: Issued | |
Spud Date: 1951-06-16 | |
Final Drill Date: 1951-06-26 | |
Well Total Depth: 1016.50 m | |
Surface Hole Latitude: 53.903044 | |
Surface Hole Longitude: -112.973337 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-06-12 | Obtained License |
1951-06-25 | Drill Stem Test Performed |
1951-06-26 | Finished Drilling |
1951-06-26 | Production Casing Operation Performed |
1951-06-26 | Well Mode changed to Drilled and Cased |
1951-06-30 | Drill Stem Test Performed |
1951-06-30 | Perforation Treatment Performed - Bullet Perforation |
1951-07-01 | Perforation Treatment Performed - Acid Wash - No Pressure |
1951-07-16 | Well Began Production |
1951-07-16 | Well Fluid changed to Crude Oil |
1951-07-16 | Well Mode changed to Pumping |
1953-09-07 | Perforation Treatment Performed - Cement Squeeze |
1953-09-11 | Perforation Treatment Performed - Jet Perforation |
1953-09-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-07-08 | Perforation Treatment Performed - Cement Squeeze |
1956-07-11 | Perforation Treatment Performed - Bullet Perforation |
1956-07-11 | Perforation Treatment Performed - Jet Perforation |
1956-07-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-08-14 | Perforation Treatment Performed - Cement Squeeze |
1956-08-17 | Perforation Treatment Performed - Bullet Perforation |
1956-08-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-08-19 | Perforation Treatment Performed - Acid Wash - No Pressure |
1956-08-19 | Perforation Treatment Performed - Bullet Perforation |
1956-08-20 | Perforation Treatment Performed - Bullet Perforation |
1956-08-21 | Perforation Treatment Performed - Acid Wash - No Pressure |
1984-01-31 | Well Fluid changed to Crude Oil |
1984-01-31 | Well Mode changed to Suspended |
1994-03-22 | Well Fluid changed to Crude Oil |
1994-03-22 | Well Mode changed to Pumping |
2009-09-04 | Well Fluid changed to Crude Oil |
2009-09-04 | Well Mode changed to Suspended |
2009-11-26 | Well Fluid changed to Crude Oil |
2009-11-26 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-06-30 | Bullet Perforation | 979.60 | 979.90 | 13 |
1956-07-11 | Bullet Perforation | 982.40 | 985.40 | 13 |
1956-07-12 | Acid Treatment | 982.40 | 985.40 | 0 |
1956-08-14 | Cement Squeeze | 982.40 | 985.40 | 0 |
1956-08-17 | Bullet Perforation | 988.20 | 989.40 | 0 |
1956-08-18 | Acid Treatment | 988.20 | 989.40 | 0 |
1956-08-19 | Bullet Perforation | 983.30 | 986.30 | 0 |
1956-08-19 | Acid Wash | 983.30 | 986.30 | 0 |
1956-08-20 | Bullet Perforation | 982.40 | 986.00 | 0 |
1956-08-21 | Acid Wash | 982.40 | 989.40 | 0 |
1951-06-30 | Bullet Perforation | 1002.80 | 1003.10 | 13 |
1951-06-30 | Bullet Perforation | 981.80 | 989.10 | 13 |
1951-07-01 | Acid Wash | 979.60 | 1003.10 | 0 |
1953-09-07 | Cement Squeeze | 979.60 | 1003.10 | 0 |
1953-09-11 | Perforation | 982.40 | 985.40 | 13 |
1953-09-12 | Acid Treatment | 982.40 | 985.40 | 0 |
1956-07-08 | Cement Squeeze | 982.40 | 985.40 | 0 |
1956-07-11 | Perforation | 982.40 | 985.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 6443 | 0.0 | 0.0 | 0.0 |
1995 | 8711 | 0.0 | 0.0 | 0.0 |
1996 | 8696 | 0.0 | 0.0 | 0.0 |
1997 | 8696 | 0.0 | 0.0 | 0.0 |
1998 | 8350 | 0.0 | 0.0 | 0.0 |
1999 | 8110 | 0.0 | 0.0 | 0.0 |
2000 | 6564 | 0.0 | 0.0 | 0.0 |
2001 | 6112 | 0.0 | 0.0 | 0.0 |
2002 | 6981 | 0.0 | 0.0 | 0.0 |
2003 | 7453 | 0.0 | 0.0 | 0.0 |
2004 | 8722 | 0.0 | 0.0 | 0.0 |
2005 | 8230 | 0.0 | 0.0 | 0.0 |
2006 | 8681 | 0.0 | 0.0 | 0.0 |
2007 | 8632 | 0.0 | 0.0 | 0.0 |
2008 | 5196 | 0.0 | 0.0 | 0.0 |
2009 | 14 | 0.0 | 0.0 | 0.0 |
2010 | 7541 | 0.0 | 0.0 | 0.0 |
2011 | 8184 | 0.0 | 0.0 | 0.0 |
2012 | 8209 | 0.0 | 0.0 | 0.0 |
2013 | 7419 | 0.0 | 0.0 | 0.0 |
2014 | 8500 | 0.0 | 0.0 | 0.0 |
2015 | 8472 | 0.0 | 0.0 | 0.0 |
2016 | 8667 | 0.0 | 0.0 | 0.0 |
2017 | 7484 | 0.0 | 0.0 | 0.0 |
2018 | 8057 | 0.0 | 0.0 | 0.0 |
2019 | 8070 | 0.0 | 0.0 | 0.0 |
2020 | 1665 | 0.0 | 0.0 | 0.0 |
For data sources see[5]