If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0574210416020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.902884,"lon":-113.066955,"icon":""}]} |
| Location: 02/16-04-057-21W4/0 | |
| Location Alias: 02/16-04-57-21 W4M | |
| Location Alias 2: 02/16-04-057-21 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 057 | |
| Meridian: 4 | |
| Range: 21 | |
| Section: 04 | |
| County/Municipality: Sturgeon County | |
| Well Name: LONG RUN HZ 102 REDWATER 16-4-57-21 | |
| Operator Name: Long Run Exploration Ltd. | |
| License Number: 0481227 | |
| License Date: 2016-11-04 | |
| License Status: Issued | |
| Spud Date: 2016-11-19 | |
| Final Drill Date: 2016-11-21 | |
| Well Total Depth: 1545.00 m | |
| Surface Hole Latitude: 53.902884 | |
| Surface Hole Longitude: -113.066955 |
| Date | Event |
|---|---|
| 2016-11-04 | Obtained License |
| 2016-11-19 | Surface Casing Operation Performed |
| 2016-11-20 | Direction Drilling Operation Performed - Deviate |
| 2016-11-20 | Direction Drilling Operation Performed - Horizontal |
| 2016-11-21 | Finished Drilling |
| 2016-11-21 | Production Casing Operation Performed |
| 2016-11-21 | Well Log Performed |
| 2016-11-21 | Well Mode changed to Drilled and Cased |
| 2016-11-22 | Rig Released |
| 2016-12-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-01-13 | Well Began Production |
| 2017-01-13 | Well Fluid changed to Crude Oil |
| 2017-01-13 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2016-11-19 | Bonanza Drilling Inc. | 5 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2016-11-20 | 341.50 | Deviate (5 - 79 degrees) |
| 2016-11-20 | 815.30 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2016-12-17 | Multi-Stage Fracture | 1507.00 | 1507.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1235.00 | 1235.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1207.00 | 1207.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1177.00 | 1177.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1142.00 | 1142.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1115.00 | 1115.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1087.00 | 1087.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1057.00 | 1057.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1027.00 | 1027.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 995.00 | 995.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 967.00 | 967.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1477.00 | 1477.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 939.00 | 939.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 911.00 | 911.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 883.00 | 883.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1447.00 | 1447.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1417.00 | 1417.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1387.00 | 1387.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1355.00 | 1355.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1327.00 | 1327.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1297.00 | 1297.10 | 0 |
| 2016-12-17 | Multi-Stage Fracture | 1267.00 | 1267.10 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2016-12-17 | 2016-12-17 | 663 | 601 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Potassium Chloride | 7447-40-7 | 100 | 81.8977 | N/A | |||
| Water | 7732-18-5 | 100 | 81.8977 | N/A | ||||
| Sand (20/40) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 1.8648 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 1.8648 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 1.8648 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 1.865 | N/A | ||||
| Yukon Black (16/30) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 14.9016 | N/A | ||
| Furfuryl Alcohol | 98-00-0 | 100 | 14.9016 | N/A | ||||
| Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0279 | N/A | |
| Water | 7732-18-5 | 100 | 0.0279 | N/A | ||||
| CAN-2300 Breaker (Enzyme HpH. 100L:1L) | Canyon Technical Services | Breaker | Cellulase Enzyme Solution | Not Available | 100 | 0.0737 | N/A | |
| Water | 7732-18-5 | 100 | 0.0736 | N/A | ||||
| CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0301 | N/A | |
| Non-hazardous base ingredient(s) | Not Available | 100 | 0.0301 | N/A | ||||
| CAN-1911 Clay Stabilizer | Canyon Technical Services | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.3675 | N/A | |
| Water | 7732-18-5 | 100 | 0.3675 | N/A | ||||
| CAN-2200 Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.176 | N/A | |
| Monoethanolamine | 141-43-5 | 100 | 0.176 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.176 | N/A | ||||
| CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0387 | N/A | |
| Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0387 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.0386 | N/A | ||||
| Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0386 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0386 | N/A | ||||
| CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.462 | N/A | |
| paraFLO 2 | Canyon Technical Services | Scale Inhibitor | Non-hazardous base ingredient(s) | Not Available | 100 | 0.1595 | N/A | |
| Silica. crystalline-quartz | 14808-60-7 | 100 | 0.1595 | N/A | ||||
| White mineral oil | 8042-47-5 | 100 | 0.1595 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2016-12-17 | 2016-12-17 | Municipal Water | 445 |
| 2016-12-17 | 2016-12-17 | Groundwater - Saline | 56 |
| 2016-12-17 | 2016-12-17 | Municipal Water | 100 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 8318 | 0.0 | 0.0 | 0.0 |
| 2018 | 8214 | 0.0 | 0.0 | 0.0 |
| 2019 | 8700 | 0.0 | 0.0 | 0.0 |
| 2020 | 2174 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-11-22 | No Incident Encountered | 0.00 | 0.00 |
| 2017-01-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]