If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0574241716000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.932825,"lon":-113.523454,"icon":""}]} |
| Location: 00/16-17-057-24W4/0 | |
| Location Alias: 00/16-17-57-24 W4M | |
| Location Alias 2: 00/16-17-057-24 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 057 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 17 | |
| County/Municipality: Sturgeon County | |
| Well Name: DORSET FAIRYDELL 16-17-57-24 | |
| Operator Name: Baytex Energy Ltd. | |
| License Number: 0008910 | |
| License Date: 1954-12-23 | |
| License Status: RecCertified | |
| Spud Date: 1955-01-24 | |
| Final Drill Date: 1955-02-16 | |
| Well Total Depth: 1223.20 m | |
| Surface Hole Latitude: 53.932825 | |
| Surface Hole Longitude: -113.523454 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1954-12-23 | Obtained License |
| 1955-02-12 | Production Casing Operation Performed |
| 1955-02-16 | Finished Drilling |
| 1955-02-16 | Perforation Treatment Performed - Open-Hole Completion |
| 1955-02-16 | Well Mode changed to Drilled and Cased |
| 1955-02-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1955-02-27 | Well Began Production |
| 1955-02-27 | Well Fluid changed to Crude Oil |
| 1955-02-27 | Well Mode changed to Flowing |
| 1955-03-07 | Well Fluid changed to Crude Oil |
| 1955-03-07 | Well Mode changed to Pumping |
| 1973-02-07 | Perforation Treatment Performed - Cement Plug |
| 1973-02-07 | Perforation Treatment Performed - Open-Hole Completion |
| 1973-02-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1983-06-01 | Perforation Treatment Performed - Cement Plug |
| 1983-06-01 | Perforation Treatment Performed - Open-Hole Completion |
| 1983-12-01 | Well Fluid changed to Crude Oil |
| 1983-12-01 | Well Mode changed to Suspended |
| 1984-10-24 | Well Fluid changed to Crude Oil |
| 1984-10-24 | Well Mode changed to Pumping |
| 1985-01-01 | Well Fluid changed to Crude Oil |
| 1985-01-01 | Well Mode changed to Suspended |
| 1987-06-09 | Well Fluid changed to Crude Oil |
| 1987-06-09 | Well Mode changed to Pumping |
| 1987-08-01 | Well Fluid changed to Crude Oil |
| 1987-08-01 | Well Mode changed to Suspended |
| 1992-02-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1992-02-12 | Plug Back Performed |
| 1992-02-12 | Well Fluid changed to Crude Oil |
| 1992-02-12 | Well Mode changed to Abandoned Zone |
| 1992-02-13 | Perforation Treatment Performed - Jet Perforation |
| 1992-02-15 | Perforation Treatment Performed - Jet Perforation |
| 1992-02-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1992-02-20 | Perforation Treatment Performed - Jet Perforation |
| 1992-02-20 | Plug Back Performed |
| 1992-02-20 | Well Log Performed |
| 1992-10-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-12-06 | Perforation Treatment Performed - Jet Perforation |
| 1992-12-06 | Well Log Performed |
| 1994-07-19 | Well Log Performed |
| 1994-07-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-07-20 | Perforation Treatment Performed - Jet Perforation |
| 1994-07-20 | Plug Back Performed |
| 1995-12-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1995-12-14 | Plug Back Performed |
| 1999-07-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1999-07-27 | Perforation Treatment Performed - Jet Perforation |
| 1999-07-27 | Plug Back Performed |
| 1999-07-27 | Well Log Performed |
| 1999-07-28 | Well Log Performed |
| 1999-10-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1999-10-12 | Perforation Treatment Performed - Cement Squeeze |
| 1999-10-12 | Perforation Treatment Performed - Jet Perforation |
| 1999-10-12 | Plug Back Performed |
| 1999-10-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1999-10-13 | Perforation Treatment Performed - Cement Squeeze |
| 1999-10-13 | Perforation Treatment Performed - Jet Perforation |
| 1999-10-13 | Plug Back Performed |
| 1999-10-15 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1955-02-16 | Open Hole/Barefoot Completion | 1213.10 | 1223.20 | 0 |
| 1992-02-13 | Perforation | 1154.40 | 1155.40 | 18 |
| 1992-02-15 | Perforation | 1143.90 | 1144.70 | 13 |
| 1992-02-15 | Perforation | 1145.50 | 1146.80 | 13 |
| 1992-02-15 | Perforation | 1148.00 | 1148.50 | 13 |
| 1992-02-20 | Packing Device Capped w/Cement | 1128.00 | 1136.00 | 0 |
| 1992-02-20 | Perforation | 1088.00 | 1090.30 | 17 |
| 1992-10-18 | Acid Treatment | 1088.00 | 1090.30 | 0 |
| 1992-12-06 | Perforation | 1081.70 | 1083.00 | 17 |
| 1992-12-06 | Perforation | 1084.30 | 1085.30 | 17 |
| 1994-07-20 | Packing Device Capped w/Cement | 1064.70 | 1073.00 | 0 |
| 1955-02-18 | Acid Treatment | 1213.10 | 1223.20 | 0 |
| 1994-07-20 | Perforation | 1022.30 | 1024.30 | 13 |
| 1995-12-14 | Packing Device Capped w/Cement | 1007.00 | 1015.00 | 0 |
| 1999-07-27 | Perforation | 315.00 | 315.30 | 13 |
| 1999-07-27 | Packing Device Capped w/Cement | 302.00 | 310.00 | 0 |
| 1999-10-12 | Perforation | 292.00 | 292.50 | 13 |
| 1999-10-12 | Cement Squeeze | 292.00 | 292.50 | 0 |
| 1999-10-12 | Packing Device Capped w/Cement | 280.00 | 289.00 | 0 |
| 1999-10-13 | Perforation | 210.00 | 210.50 | 13 |
| 1999-10-13 | Cement Squeeze | 210.00 | 210.50 | 0 |
| 1999-10-13 | Packing Device Capped w/Cement | 200.00 | 208.00 | 0 |
| 1973-02-07 | Cement Plug | 1219.50 | 1223.20 | 0 |
| 1973-02-07 | Open Hole/Barefoot Completion | 1213.10 | 1219.50 | 0 |
| 1973-02-08 | Acid Treatment | 1213.10 | 1219.50 | 0 |
| 1983-06-01 | Cement Plug | 1217.20 | 1219.50 | 0 |
| 1983-06-01 | Open Hole/Barefoot Completion | 1213.10 | 1217.20 | 0 |
| 1992-02-12 | Packing Device Capped w/Cement | 1183.00 | 1191.00 | 0 |
| 1992-02-13 | Perforation | 1153.00 | 1153.70 | 18 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 5674 | 0.0 | 0.0 | 0.0 |
| 1968 | 5001 | 0.0 | 0.0 | 0.0 |
| 1969 | 5897 | 0.0 | 0.0 | 0.0 |
| 1970 | 4600 | 0.0 | 0.0 | 0.0 |
| 1971 | 5497 | 0.0 | 0.0 | 0.0 |
| 1972 | 6866 | 0.0 | 0.0 | 0.0 |
| 1973 | 7137 | 0.0 | 0.0 | 0.0 |
| 1974 | 6750 | 0.0 | 0.0 | 0.0 |
| 1975 | 5520 | 0.0 | 0.0 | 0.0 |
| 1976 | 6148 | 0.0 | 0.0 | 0.0 |
| 1977 | 7456 | 0.0 | 0.0 | 0.0 |
| 1978 | 8242 | 0.0 | 0.0 | 0.0 |
| 1979 | 8376 | 0.0 | 0.0 | 0.0 |
| 1980 | 8467 | 0.0 | 0.0 | 0.0 |
| 1981 | 7971 | 0.0 | 0.0 | 0.0 |
| 1982 | 7927 | 0.0 | 0.0 | 0.0 |
| 1983 | 7389 | 0.0 | 0.0 | 0.0 |
| 1984 | 1079 | 0.0 | 0.0 | 0.0 |
| 1987 | 640 | 0.0 | 0.0 | 0.0 |
For data sources see[5]