If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0575081706000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.924339,"lon":-115.157734,"icon":""}]} |
| Location: 00/06-17-057-08W5/0 | |
| Location Alias: 00/06-17-57-08 W5M | |
| Location Alias 2: 00/06-17-057-08 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 057 | |
| Meridian: 5 | |
| Range: 08 | |
| Section: 17 | |
| County/Municipality: Lac Ste. Anne County | |
| Well Name: CS PADDLE RIVER 6-17-57-8 | |
| Operator Name: CNOOC Petroleum North America ULC | |
| License Number: 0021793 | |
| License Date: 1961-12-07 | |
| License Status: RecCertified | |
| Spud Date: 1961-12-17 | |
| Final Drill Date: 1962-01-05 | |
| Well Total Depth: 1571.20 m | |
| Surface Hole Latitude: 53.924339 | |
| Surface Hole Longitude: -115.157734 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1961-12-07 | Obtained License |
| 1961-12-30 | Drill Stem Test Performed |
| 1962-01-03 | Drill Stem Test Performed |
| 1962-01-05 | Finished Drilling |
| 1962-01-06 | Production Casing Operation Performed |
| 1962-02-13 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 1962-02-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1962-02-13 | Perforation Treatment Performed - Fractured |
| 1962-10-03 | Well Mode changed to Drilled and Cased |
| 1985-07-19 | Well Log Performed |
| 1985-07-22 | Well Fluid changed to Gas |
| 1985-07-22 | Well Mode changed to Testing |
| 1985-07-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1985-07-23 | Perforation Treatment Performed - Jet Perforation |
| 1985-07-23 | Plug Back Performed |
| 1985-07-23 | Well Fluid changed to Gas |
| 1985-07-23 | Well Log Performed |
| 1985-07-23 | Well Mode changed to Abandoned |
| 1985-07-24 | Perforation Treatment Performed - Remedial Casing |
| 1985-08-13 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1962-02-13 | Hydra Jet Perforation | 1512.10 | 1512.10 | 0 |
| 1962-02-13 | Fracture | 1512.10 | 1512.10 | 0 |
| 1962-02-13 | Acid Treatment | 1512.10 | 1512.10 | 0 |
| 1962-02-13 | Fracture | 1512.10 | 1512.10 | 0 |
| 1985-07-23 | Packing Device Capped w/Cement | 1472.00 | 1480.00 | 0 |
| 1985-07-23 | Perforation | 577.50 | 578.00 | 7 |
| 1985-07-24 | Remedial Casing Cementing | 577.50 | 578.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1984 | 1 | 0.0 | 0.0 | 0.0 |
For data sources see[5]