If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0575090106002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.895281,"lon":-115.207152,"icon":""}]} |
Location: 00/06-01-057-09W5/2 | |
Location Alias: 00/06-01-57-09 W5M | |
Location Alias 2: 00/06-01-057-09 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 5 | |
Range: 09 | |
Section: 01 | |
County/Municipality: Lac Ste. Anne County | |
Well Name: TIDEWATER PADDLER 6-1-57-9 | |
Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
License Number: 0020725 | |
License Date: 1961-05-11 | |
License Status: Suspension | |
Spud Date: 1961-05-20 | |
Final Drill Date: 1961-06-09 | |
Well Total Depth: 1652.90 m | |
Surface Hole Latitude: 53.895281 | |
Surface Hole Longitude: -115.207152 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1961-05-11 | Obtained License |
1961-06-01 | Drill Stem Test Performed |
1961-06-03 | Lost Circulation Occurred |
1961-06-09 | Finished Drilling |
1961-06-09 | Well Mode changed to Drilled and Cased |
1961-06-10 | Drill Stem Test Performed |
1961-06-11 | Production Casing Operation Performed |
1961-06-13 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1961-06-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1961-06-13 | Perforation Treatment Performed - Fractured |
1980-08-06 | Perforation Treatment Performed - Jet Perforation |
1980-08-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-11-11 | Well Log Performed |
1988-11-12 | Perforation Treatment Performed - Jet Perforation |
1988-11-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-07-25 | Perforation Treatment Performed - Cement Squeeze |
1989-07-25 | Plug Back Performed |
1989-07-27 | Well Log Performed |
1989-07-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-07-28 | Perforation Treatment Performed - Jet Perforation |
1989-07-28 | Well Log Performed |
1989-08-01 | Well Began Injection |
1989-08-01 | Well Fluid changed to Water |
1989-08-01 | Well Type changed to Disposal |
1990-01-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-05-02 | Well Log Performed |
1990-05-03 | Perforation Treatment Performed - Jet Perforation |
1990-05-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-10-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2015-07-24 | Well Fluid changed to Water |
2015-07-24 | Well Log Performed |
2015-07-24 | Well Mode changed to Suspended |
2015-07-24 | Well Type changed to Disposal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1961-06-13 | Hydra Jet Perforation | 1563.90 | 1563.90 | 0 |
1989-07-28 | Acid Treatment | 1584.90 | 1591.00 | 0 |
1990-01-22 | Acid Treatment | 1584.90 | 1591.00 | 0 |
1990-05-03 | Perforation | 1579.50 | 1583.80 | 13 |
1990-05-05 | Acid Treatment | 1579.50 | 1591.00 | 0 |
1990-10-19 | Acid Treatment | 1579.50 | 1591.00 | 0 |
1961-06-13 | Acid Treatment | 1563.90 | 1563.90 | 0 |
1961-06-13 | Fracture | 1563.90 | 1563.90 | 0 |
1980-08-06 | Perforation | 1562.30 | 1566.00 | 7 |
1980-08-07 | Acid Treatment | 1562.30 | 1566.00 | 0 |
1988-11-12 | Perforation | 1555.70 | 1564.20 | 13 |
1988-11-15 | Acid Treatment | 1555.70 | 1564.20 | 0 |
1989-07-25 | Cement Squeeze | 1555.70 | 1566.00 | 0 |
1989-07-28 | Perforation | 1584.90 | 1591.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2004 | 0 | 0.0 | 0.0 | 0.0 |
2005 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1961-06-03 | Lost Circulation | 1572.80 | 1576.40 |
For data sources see[6]