If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0575172805000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.953794,"lon":-116.473373,"icon":""}]} |
Location: 00/05-28-057-17W5/0 | |
Location Alias: 00/05-28-57-17 W5M | |
Location Alias 2: 00/05-28-057-17 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 5 | |
Range: 17 | |
Section: 28 | |
County/Municipality: Yellowhead County | |
Well Name: BRCL BRONSON 5-28-57-17 | |
Operator Name: ConocoPhillips Canada Operations ULC | |
License Number: 0219090 | |
License Date: 1998-11-30 | |
License Status: RecCertified | |
Spud Date: 1998-12-05 | |
Final Drill Date: 1998-12-31 | |
Well Total Depth: 3149.00 m | |
Surface Hole Latitude: 53.953794 | |
Surface Hole Longitude: -116.473373 |
Date | Event |
---|---|
1998-11-30 | Obtained License |
1998-12-09 | Surface Casing Operation Performed |
1998-12-31 | Finished Drilling |
1999-01-01 | Well Log Performed |
1999-01-02 | Production Casing Operation Performed |
1999-01-04 | Rig Released |
1999-01-04 | Well Mode changed to Drilled and Cased |
1999-01-21 | Well Log Performed |
1999-01-22 | Perforation Treatment Performed - Jet Perforation |
1999-01-22 | Well Log Performed |
1999-01-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-01-28 | Perforation Treatment Performed - Acid Wash - No Pressure |
1999-02-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-06-05 | Well Began Production |
1999-06-05 | Well Fluid changed to Gas |
1999-06-05 | Well Mode changed to Flowing |
2000-01-21 | Well Fluid changed to Gas |
2000-01-21 | Well Mode changed to Suspended |
2002-09-12 | Perforation Treatment Performed - Jet Perforation |
2002-09-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-09-18 | Well Log Performed |
2002-09-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-09-19 | Plug Back Performed |
2002-09-19 | Well Fluid changed to Gas |
2002-09-19 | Well Mode changed to Abandoned Zone |
2002-09-20 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-01-22 | Perforation | 2937.50 | 2941.00 | 20 |
2002-09-19 | Packing Device Capped w/Cement | 2749.00 | 2757.00 | 0 |
1999-01-22 | Perforation | 2964.00 | 2965.00 | 20 |
1999-01-22 | Perforation | 2984.50 | 2992.00 | 20 |
1999-01-28 | Acid Wash | 2937.50 | 2992.00 | 0 |
1999-01-28 | Acid Treatment | 2937.50 | 2992.00 | 0 |
1999-02-03 | Acid Treatment | 2937.50 | 2992.00 | 0 |
2002-09-12 | Perforation | 2766.00 | 2780.00 | 13 |
2002-09-15 | Acid Treatment | 2766.00 | 2780.00 | 0 |
2002-09-19 | Packing Device Capped w/Cement | 2808.00 | 2822.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 3776 | 0.0 | 0.0 | 0.0 |
For data sources see[5]