X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575200111000

Well Details

Well ID: 0575200111000
Loading map...
Location: 00/11-01-057-20W5/0
Location Alias: 00/11-01-57-20 W5M
Location Alias 2: 00/11-01-057-20 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 20
Section: 01
County/Municipality: Yellowhead County
Well Name: SOC PINE CK 11-1-57-20
Operator Name: AlphaBow Energy Ltd.
License Number: 0078876
License Date: 1979-10-26
License Status: Issued
Spud Date: 1979-11-10
Final Drill Date: 1979-12-21
Well Total Depth: 2855.00 m
Surface Hole Latitude: 53.898525
Surface Hole Longitude: -116.839107

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-10-26 Obtained License
1979-12-21 Finished Drilling
1979-12-21 Well Mode changed to Drilled and Cased
1979-12-23 Drill Stem Test Performed
1979-12-25 Production Casing Operation Performed
1980-02-04 Perforation Treatment Performed - Jet Perforation
1980-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-04-01 Perforation Treatment Performed - Jet Perforation
1980-04-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-04-03 Perforation Treatment Performed - Jet Perforation
1980-04-04 Perforation Treatment Performed - Fractured
1980-04-09 Well Began Production
1980-04-09 Well Fluid changed to Crude Oil
1980-04-09 Well Mode changed to Flowing
1985-01-15 Well Log Performed
2000-10-24 Well Fluid changed to Crude Oil
2000-10-24 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-04 Perforation 2812.00 2825.00 7
1980-04-04 Fracture 2025.00 2036.00 0
1980-02-04 Perforation 2786.00 2796.00 7
1980-02-07 Acid Treatment 2812.00 2825.00 0
1980-02-10 Acid Treatment 2786.00 2796.00 0
1980-03-31 Packing Device Capped w/Cement 2742.00 2750.00 0
1980-04-01 Perforation 2434.40 2451.40 4
1980-04-03 Packing Device Capped w/Cement 2402.00 2410.00 0
1980-04-03 Perforation 2025.00 2029.00 15
1980-04-03 Perforation 2033.00 2036.00 15

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1799 0.0 0.0 0.0
1981 1852 0.0 0.0 0.0
1982 2718 0.0 0.0 0.0
1983 2788 0.0 0.0 0.0
1984 2523 0.0 0.0 0.0
1985 2175 0.0 0.0 0.0
1986 2284 0.0 0.0 0.0
1987 3129 0.0 0.0 0.0
1988 3362 0.0 0.0 0.0
1989 2868 0.0 0.0 0.0
1990 3496 0.0 0.0 0.0
1991 3227 0.0 0.0 0.0
1992 3405 0.0 0.0 0.0
1993 3396 0.0 0.0 0.0
1994 1878 0.0 0.0 0.0
1995 2123 0.0 0.0 0.0
1996 1288 0.0 0.0 0.0
2000 7656 0.0 0.0 0.0
2001 7537 0.0 0.0 0.0
2002 8169 0.0 0.0 0.0
2003 8351 0.0 0.0 0.0
2004 8692 0.0 0.0 0.0
2005 8688 0.0 0.0 0.0
2006 8758 0.0 0.0 0.0
2007 8756 0.0 0.0 0.0
2008 8782 0.0 0.0 0.0
2009 8327 0.0 0.0 0.0
2010 8542 0.0 0.0 0.0
2011 8491 0.0 0.0 0.0
2012 7378 0.0 0.0 0.0
2013 8327 0.0 0.0 0.0
2014 7772 0.0 0.0 0.0
2015 7049 0.0 0.0 0.0
2016 8736 0.0 0.0 0.0
2017 7493 0.0 0.0 0.0
2018 5387 0.0 0.0 0.0
2019 2704 0.0 0.0 0.0
2020 1457 0.0 0.0 0.0

For data sources see[5]

References