X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575202801000

Well Details

Well ID: 0575202801000
Loading map...
Location: 00/01-28-057-20W5/0
Location Alias: 00/01-28-57-20 W5M
Location Alias 2: 00/01-28-057-20 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 20
Section: 28
County/Municipality: Yellowhead County
Well Name: SOC PINE CK 1-28-57-20
Operator Name: AlphaBow Energy Ltd.
License Number: 0414207
License Date: 2009-11-19
License Status: Issued
Spud Date: 2009-12-04
Final Drill Date: 2009-12-29
Well Total Depth: 3043.00 m
Surface Hole Latitude: 53.963280
Surface Hole Longitude: -116.904241

For data sources see[1][2]

Well History

Date Event
2009-11-19 Obtained License
2009-12-06 Surface Casing Operation Performed
2009-12-11 Direction Drilling Operation Performed - Horizontal
2009-12-15 Intermediate Casing Operation Performed
2009-12-15 Well Log Performed
2009-12-28 Liner Casing Operation Performed
2009-12-29 Finished Drilling
2009-12-29 Perforation Treatment Performed - Open-Hole Completion
2009-12-29 Rig Released
2009-12-29 Well Mode changed to Drilled and Cased
2010-01-10 Perforation Treatment Performed - Multi-Stage Fracture
2010-01-16 Well Log Performed
2010-03-25 Well Began Production
2010-03-25 Well Fluid changed to Crude Oil
2010-03-25 Well Mode changed to Flowing
2018-12-01 Well Fluid changed to Crude Oil
2018-12-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-12-11 1508.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-12-29 Open Hole/Barefoot Completion 3042.00 3043.00 0
2010-01-10 Multi-Stage Fracture 2108.70 2108.80 0
2010-01-10 Multi-Stage Fracture 3015.00 3015.10 0
2010-01-10 Multi-Stage Fracture 2901.90 2902.00 0
2010-01-10 Multi-Stage Fracture 2788.90 2789.00 0
2010-01-10 Multi-Stage Fracture 2675.40 2675.50 0
2010-01-10 Multi-Stage Fracture 2561.90 2562.00 0
2010-01-10 Multi-Stage Fracture 2448.30 2448.40 0
2010-01-10 Multi-Stage Fracture 2334.80 2334.90 0
2010-01-10 Multi-Stage Fracture 2221.90 2222.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6425 0.0 0.0 0.0
2011 7142 0.0 0.0 0.0
2012 7630 0.0 0.0 0.0
2013 7084 0.0 0.0 0.0
2014 5451 0.0 0.0 0.0
2015 6355 0.0 0.0 0.0
2016 7924 0.0 0.0 0.0
2017 2567 0.0 0.0 0.0

For data sources see[6]

References