X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575222416000

Well Details

Well ID: 0575222416000
Loading map...
Location: 00/16-24-057-22W5/0
Location Alias: 00/16-24-57-22 W5M
Location Alias 2: 00/16-24-057-22 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 22
Section: 24
County/Municipality: Yellowhead County
Well Name: TOURMALINE SUNDANCE 16-24-57-22
Operator Name: Tourmaline Oil Corp.
License Number: 0407585
License Date: 2009-01-09
License Status: Issued
Spud Date: 2009-03-03
Final Drill Date: 2009-03-15
Well Total Depth: 2791.00 m
Surface Hole Latitude: 53.944738
Surface Hole Longitude: -117.128585

For data sources see[1][2]

Well History

Date Event
2009-01-09 Obtained License
2009-03-06 Surface Casing Operation Performed
2009-03-15 Finished Drilling
2009-03-15 Well Mode changed to Drilled and Cased
2009-03-16 Well Log Performed
2009-03-18 Production Casing Operation Performed
2009-03-19 Rig Released
2009-06-14 Perforation Treatment Performed - Jet Perforation
2009-06-16 Perforation Treatment Performed - Fractured
2009-06-17 Perforation Treatment Performed - Jet Perforation
2009-06-18 Perforation Treatment Performed - Fractured
2009-06-18 Perforation Treatment Performed - Jet Perforation
2009-06-19 Perforation Treatment Performed - Fractured
2009-06-19 Perforation Treatment Performed - Jet Perforation
2009-06-20 Perforation Treatment Performed - Fractured
2009-09-01 Well Began Production
2009-09-01 Well Fluid changed to Gas
2009-09-01 Well Mode changed to Flowing
2011-05-09 Well Fluid changed to Gas
2011-05-09 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-06-14 Perforation 2740.00 2741.00 5
2009-06-18 Fracture 2535.50 2653.00 0
2009-06-18 Perforation 2422.50 2423.50 3
2009-06-18 Perforation 2434.00 2435.00 6
2009-06-18 Perforation 2468.00 2469.00 12
2009-06-18 Perforation 2482.50 2483.50 9
2009-06-19 Fracture 2422.50 2483.50 0
2009-06-19 Perforation 2266.00 2267.00 9
2009-06-19 Perforation 2275.00 2276.00 12
2009-06-19 Perforation 2281.00 2282.00 9
2009-06-19 Fracture 2266.00 2282.00 0
2009-06-14 Perforation 2760.00 2761.00 8
2009-06-19 Perforation 1940.00 1941.00 15
2009-06-19 Perforation 1960.00 1961.00 15
2009-06-20 Fracture 1940.00 1961.00 0
2009-06-14 Perforation 2764.50 2765.50 8
2009-06-14 Perforation 2768.00 2769.00 5
2009-06-16 Fracture 2740.00 2769.00 0
2009-06-17 Perforation 2535.50 2536.50 9
2009-06-17 Perforation 2567.50 2568.50 3
2009-06-17 Perforation 2606.50 2607.50 9
2009-06-17 Perforation 2652.00 2653.00 9

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1227 0.0 0.0 0.0
2010 8355 0.0 0.0 0.0
2011 7570 0.0 0.0 0.0
2012 7547 0.0 0.0 0.0
2013 8205 0.0 0.0 0.0
2014 8626 0.0 0.0 0.0
2015 8738 0.0 0.0 0.0
2016 8456 0.0 0.0 0.0
2017 8719 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 8615 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[5]

References