X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575222808000

Well Details

Well ID: 0575222808000
Loading map...
Location: 00/08-28-057-22W5/0
Location Alias: 00/08-28-57-22 W5M
Location Alias 2: 00/08-28-057-22 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 22
Section: 28
County/Municipality: Yellowhead County
Well Name: TALISMAN HZ SUNDANCE 8-28-57-22
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0466971
License Date: 2014-05-29
License Status: Issued
Spud Date: 2015-01-05
Final Drill Date: 2015-01-22
Well Total Depth: 4020.00 m
Surface Hole Latitude: 53.955707
Surface Hole Longitude: -117.227202

For data sources see[1][2]

Well History

Date Event
2014-05-29 Obtained License
2015-01-07 Surface Casing Operation Performed
2015-01-14 Direction Drilling Operation Performed - Deviate
2015-01-16 Direction Drilling Operation Performed - Horizontal
2015-01-16 Well Log Performed
2015-01-17 Intermediate Casing Operation Performed
2015-01-22 Finished Drilling
2015-01-22 Well Log Performed
2015-01-22 Well Mode changed to Drilled and Cased
2015-01-25 Production Casing Operation Performed
2015-01-26 Rig Released
2015-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-16 Well Fluid changed to Gas
2015-02-16 Well Mode changed to Testing
2015-03-01 Well Began Production
2015-03-01 Well Fluid changed to Gas
2015-03-01 Well Mode changed to Flowing
2017-12-19 Well Fluid changed to Gas
2017-12-19 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-01-05 Trinidad Drilling Ltd. 32 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-01-14 2039.00 Deviate (5 - 79 degrees)
2015-01-16 2421.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-02-11 Multi-Stage Fracture 3945.80 3945.90 0
2015-02-13 Multi-Stage Fracture 3043.60 3043.70 0
2015-02-13 Multi-Stage Fracture 2937.30 2937.40 0
2015-02-13 Multi-Stage Fracture 2843.70 2843.80 0
2015-02-13 Multi-Stage Fracture 2737.20 2737.30 0
2015-02-13 Multi-Stage Fracture 2631.60 2631.70 0
2015-02-13 Multi-Stage Fracture 2538.00 2538.10 0
2015-02-12 Multi-Stage Fracture 3863.80 3863.90 0
2015-02-12 Multi-Stage Fracture 3758.60 3758.70 0
2015-02-12 Multi-Stage Fracture 3666.90 3667.00 0
2015-02-12 Multi-Stage Fracture 3561.50 3561.60 0
2015-02-12 Multi-Stage Fracture 3456.70 3456.80 0
2015-02-12 Multi-Stage Fracture 3350.30 3350.40 0
2015-02-12 Multi-Stage Fracture 3256.90 3257.00 0
2015-02-13 Multi-Stage Fracture 3150.20 3150.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-02-11 2015-02-13 2,311 1,066 N/A
2 2015-02-12 2015-02-13 2,311 0 N/A
3 2015-02-11 2015-02-12 2,311 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 22.3051 N/A
water Not Available 100 44.8053 N/A
Econo 20/40 Trican amorphous silicon dioxide 7631-86-9 100 30.7143 N/A
mullite 1302-93-8 100 32.1745 N/A
silica crystalline-cristobalite 14464-46-1 100 31.7081 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0107 N/A
dibromoacetonitrile 3252-43-5 100 0.0107 N/A
non-hazardous ingredients Not Available 100 0.0107 N/A
polyethylene glycol 25322-68-3 100 0.0107 N/A
sodium bromide 7647-15-6 100 0.0107 N/A
EnCap-HP Trican Breaker ammonium persulfate 7727-54-0 100 0.0053 N/A
cured acrylic resin Not Available 100 0.0053 N/A
silica crystalline 14808-60-7 100 0.0053 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1541 N/A
water Not Available 100 0.1518 N/A
WF-3 Trican Foamer cocamidopropyl betaine 61789-40-0 100 0.5678 N/A
potassium formate 590-29-4 100 0.5678 N/A
2 pH- 2 Trican Buffer acetic acid 64-19-7 100 0.0914 N/A
water Not Available 100 0.0914 N/A
WG-33L Trican Gelling Agent carboxymethyl hydroxypropyl guar 68130-15-4 100 0.361 N/A
mineral oil Not Available 100 0.361 N/A
3 WG-7L Trican Gelling Agent carboxymethyl cellulose sodium salt 9004-32-4 100 0.3978 N/A
naphtha (petroleum). hydrotreated heavy 64742-48-9 100 0.3875 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-02-10 2015-02-14 Central Water Distribution Facility 1170

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 7144 0.0 0.0 0.0
2016 8694 0.0 0.0 0.0
2017 8455 0.0 0.0 0.0
2018 8161 0.0 0.0 0.0
2019 8448 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-01-26 No Incident Encountered 0.00 0.00
2015-02-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References