If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0575231408002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.924479,"lon":-117.302147,"icon":""}]} |
| Location: 00/08-14-057-23W5/2 | |
| Location Alias: 00/08-14-57-23 W5M | |
| Location Alias 2: 00/08-14-057-23 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 057 | |
| Meridian: 5 | |
| Range: 23 | |
| Section: 14 | |
| County/Municipality: Yellowhead County | |
| Well Name: FAIRBORNE WILDR 8-14-57-23 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0296868 | |
| License Date: 2003-11-26 | |
| License Status: Issued | |
| Spud Date: 2003-12-08 | |
| Final Drill Date: 2004-01-29 | |
| Well Total Depth: 3800.00 m | |
| Surface Hole Latitude: 53.924479 | |
| Surface Hole Longitude: -117.302147 |
| Date | Event |
|---|---|
| 2003-11-26 | Obtained License |
| 2003-12-09 | Surface Casing Operation Performed |
| 2004-01-04 | Well Log Performed |
| 2004-01-05 | Intermediate Casing Operation Performed |
| 2004-01-29 | Finished Drilling |
| 2004-01-29 | Well Log Performed |
| 2004-01-29 | Well Mode changed to Drilled and Cased |
| 2004-01-31 | Liner Casing Operation Performed |
| 2004-02-02 | Rig Released |
| 2004-02-25 | Well Log Performed |
| 2004-03-01 | Well Log Performed |
| 2004-03-07 | Perforation Treatment Performed - Jet Perforation |
| 2004-03-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2005-04-27 | Well Log Performed |
| 2005-06-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2005-06-07 | Perforation Treatment Performed - Chemical Squeeze |
| 2009-09-09 | Well Log Performed |
| 2009-09-10 | Well Log Performed |
| 2009-09-11 | Well Log Performed |
| 2009-09-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2009-09-13 | Well Log Performed |
| 2009-09-17 | Perforation Treatment Performed - Fractured |
| 2009-09-23 | Perforation Treatment Performed - Jet Perforation |
| 2009-09-23 | Well Log Performed |
| 2009-09-25 | Well Log Performed |
| 2009-09-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2010-01-11 | Well Log Performed |
| 2010-01-11 | Well Structure changed to Commingled |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-03-07 | Perforation | 3689.50 | 3696.00 | 17 |
| 2004-03-11 | Acid Treatment | 3708.50 | 3710.50 | 0 |
| 2004-03-11 | Acid Treatment | 3711.50 | 3717.50 | 0 |
| 2004-03-11 | Acid Treatment | 3719.00 | 3722.50 | 0 |
| 2005-06-07 | Chemical Squeeze | 3697.50 | 3700.50 | 0 |
| 2005-06-07 | Chemical Squeeze | 3703.00 | 3706.00 | 0 |
| 2005-06-07 | Chemical Squeeze | 3708.50 | 3710.50 | 0 |
| 2005-06-07 | Chemical Squeeze | 3711.50 | 3717.50 | 0 |
| 2005-06-07 | Chemical Squeeze | 3719.00 | 3722.50 | 0 |
| 2005-06-07 | Acid Treatment | 3697.50 | 3700.50 | 0 |
| 2005-06-07 | Acid Treatment | 3703.00 | 3706.00 | 0 |
| 2004-03-07 | Perforation | 3697.50 | 3700.50 | 17 |
| 2005-06-07 | Acid Treatment | 3708.50 | 3710.50 | 0 |
| 2005-06-07 | Acid Treatment | 3711.50 | 3717.50 | 0 |
| 2005-06-07 | Acid Treatment | 3719.00 | 3722.50 | 0 |
| 2009-09-12 | Acid Treatment | 3689.50 | 3700.50 | 0 |
| 2009-09-17 | Fracture | 3689.50 | 3700.50 | 0 |
| 2009-09-23 | Perforation | 3674.00 | 3676.00 | 17 |
| 2009-09-23 | Perforation | 3671.50 | 3672.50 | 17 |
| 2009-09-30 | Acid Treatment | 3671.50 | 3676.00 | 0 |
| 2004-03-07 | Perforation | 3703.00 | 3706.00 | 17 |
| 2004-03-07 | Perforation | 3708.50 | 3710.50 | 17 |
| 2004-03-07 | Perforation | 3711.50 | 3717.50 | 17 |
| 2004-03-07 | Perforation | 3719.00 | 3722.50 | 17 |
| 2004-03-11 | Acid Treatment | 3689.50 | 3696.00 | 0 |
| 2004-03-11 | Acid Treatment | 3697.50 | 3700.50 | 0 |
| 2004-03-11 | Acid Treatment | 3703.00 | 3706.00 | 0 |
For data sources see[4]