X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575241002000

Well Details

Well ID: 0575241002000
Loading map...
Location: 00/02-10-057-24W5/0
Location Alias: 00/02-10-57-24 W5M
Location Alias 2: 00/02-10-057-24 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 24
Section: 10
County/Municipality: Yellowhead County
Well Name: TALISMAN WILD RIV 2-10-57-24
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0437175
License Date: 2011-09-26
License Status: Issued
Spud Date: 2012-01-29
Final Drill Date: 2012-02-09
Well Total Depth: 3157.00 m
Surface Hole Latitude: 53.905454
Surface Hole Longitude: -117.476102

For data sources see[1][2]

Well History

Date Event
2011-09-26 Obtained License
2012-01-31 Surface Casing Operation Performed
2012-02-02 Direction Drilling Operation Performed - Deviate
2012-02-09 Finished Drilling
2012-02-09 Well Log Performed
2012-02-09 Well Mode changed to Drilled and Cased
2012-02-10 Production Casing Operation Performed
2012-02-11 Rig Released
2012-02-18 Perforation Treatment Performed - Jet Perforation
2012-02-22 Perforation Treatment Performed - Fractured
2012-02-22 Perforation Treatment Performed - Jet Perforation
2012-02-23 Perforation Treatment Performed - Fractured
2012-02-23 Perforation Treatment Performed - Jet Perforation
2012-02-24 Perforation Treatment Performed - Fractured
2012-03-20 Well Began Production
2012-03-20 Well Fluid changed to Gas
2012-03-20 Well Mode changed to Flowing
2013-01-18 Well Fluid changed to Gas
2013-01-18 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-29 Horizon Drilling Inc. 45 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-02 1320.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-18 Perforation 3121.00 3122.00 13
2012-02-22 Perforation 2965.00 2965.50 6
2012-02-23 Perforation 2783.00 2783.50 6
2012-02-23 Perforation 2777.00 2777.50 6
2012-02-23 Perforation 2773.00 2773.50 6
2012-02-23 Fracture 2998.00 2998.50 0
2012-02-23 Fracture 2930.00 2965.50 0
2012-02-23 Perforation 2785.00 2786.00 6
2012-02-24 Fracture 2773.00 2786.00 0
2012-02-18 Perforation 3124.00 3125.00 13
2012-02-18 Perforation 3127.00 3128.00 13
2012-02-22 Perforation 2940.00 2940.50 6
2012-02-22 Perforation 2960.00 2960.50 6
2012-02-22 Perforation 2930.00 2930.50 6
2012-02-22 Perforation 2937.00 2937.50 6
2012-02-22 Perforation 2998.00 2998.50 6
2012-02-22 Fracture 3121.00 3128.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7099 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8267 0.0 0.0 0.0
2015 8739 0.0 0.0 0.0
2016 8318 0.0 0.0 0.0
2017 7547 0.0 0.0 0.0
2018 7697 0.0 0.0 0.0
2019 6792 0.0 0.0 0.0
2020 2064 0.0 0.0 0.0

For data sources see[7]

References