X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575252007000

Well Details

Well ID: 0575252007000
Loading map...
Location: 00/07-20-057-25W5/0
Location Alias: 00/07-20-57-25 W5M
Location Alias 2: 00/07-20-057-25 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 25
Section: 20
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ WILD RIV 7-20-57-25
Operator Name: Tourmaline Oil Corp.
License Number: 0492793
License Date: 2018-12-17
License Status: Amended
Spud Date: 2019-07-30
Final Drill Date: 2019-09-13
Well Total Depth: 5217.00 m
Surface Hole Latitude: 53.918927
Surface Hole Longitude: -117.675908

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2019-09-07 2785.00 Deviate (5 - 79 degrees)
2019-09-09 3121.70 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-09-30 Multi-Stage Fracture 5153.80 5153.90 0
2019-10-01 Multi-Stage Fracture 4706.40 4706.50 0
2019-10-01 Multi-Stage Fracture 4577.30 4577.40 0
2019-10-01 Multi-Stage Fracture 4524.90 4525.00 0
2019-10-01 Multi-Stage Fracture 4472.70 4472.80 0
2019-10-01 Multi-Stage Fracture 4420.30 4420.40 0
2019-10-01 Multi-Stage Fracture 4367.90 4368.00 0
2019-10-01 Multi-Stage Fracture 4315.50 4315.60 0
2019-10-01 Multi-Stage Fracture 4263.10 4263.20 0
2019-10-01 Multi-Stage Fracture 4210.70 4210.80 0
2019-10-01 Multi-Stage Fracture 4158.30 4158.40 0
2019-09-30 Multi-Stage Fracture 5112.50 5112.60 0
2019-10-01 Multi-Stage Fracture 4105.90 4106.00 0
2019-10-01 Multi-Stage Fracture 4053.50 4053.60 0
2019-10-01 Multi-Stage Fracture 4001.00 4001.10 0
2019-10-01 Multi-Stage Fracture 3949.00 3949.10 0
2019-10-01 Multi-Stage Fracture 3896.60 3896.70 0
2019-10-01 Multi-Stage Fracture 3844.20 3844.30 0
2019-10-01 Multi-Stage Fracture 3791.80 3791.90 0
2019-10-01 Multi-Stage Fracture 3739.30 3739.40 0
2019-10-01 Multi-Stage Fracture 3686.90 3687.00 0
2019-10-01 Multi-Stage Fracture 3634.50 3634.60 0
2019-09-30 Multi-Stage Fracture 5060.10 5060.20 0
2019-10-01 Multi-Stage Fracture 3582.10 3582.20 0
2019-10-01 Multi-Stage Fracture 3529.70 3529.80 0
2019-10-01 Multi-Stage Fracture 3477.30 3477.40 0
2019-10-01 Multi-Stage Fracture 3425.10 3425.20 0
2019-10-01 Multi-Stage Fracture 3372.70 3372.80 0
2019-10-01 Multi-Stage Fracture 3320.30 3320.40 0
2019-10-01 Multi-Stage Fracture 3267.90 3268.00 0
2019-10-01 Multi-Stage Fracture 3228.10 3228.20 0
2019-10-01 Multi-Stage Fracture 3188.30 3188.40 0
2019-10-01 Multi-Stage Fracture 3148.50 3148.60 0
2019-09-30 Multi-Stage Fracture 5007.70 5007.80 0
2019-09-30 Multi-Stage Fracture 4955.30 4955.40 0
2019-09-30 Multi-Stage Fracture 4902.80 4902.90 0
2019-09-30 Multi-Stage Fracture 4850.50 4850.60 0
2019-09-30 Multi-Stage Fracture 4798.60 4798.70 0
2019-09-30 Multi-Stage Fracture 4746.20 4746.30 0

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-09-30 2019-10-01 3,039 8,785 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.0771 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.7578 N/A
silica crystalline 14808-60-7 100 3.7578 N/A
Sand - Tier 1 40/70 Trican silica crystalline 14808-60-7 100 11.1041 N/A
Sand - Tier 2 50/140 Trican silica crystalline 14808-60-7 100 1.8789 N/A
Aqucar DB20 Biocide Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0104 N/A
dibromoacetonitrile 3252-43-5 100 0.0104 N/A
non-hazardous ingredients Not Available 100 0.0104 N/A
polyethylene glycol 25322-68-3 100 0.0104 N/A
sodium bromide 7647-15-6 100 0.0104 N/A
CC-7 Clay Stabilizer Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0872 N/A
water Not Available 100 0.0872 N/A
FR-22 Concentrated Friction Reducer Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0443 N/A
non-hazardous ingredients Not Available 100 0.0443 N/A
S-17X Surfactant Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0398 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0398 N/A
methanol 67-56-1 100 0.0398 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0398 N/A
non-hazardous ingredients Not Available 100 0.0398 N/A

For data sources see[5]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-09-27 2019-09-28 Recycled Fracturing Water (treated at well site) 2111
2019-09-28 2019-09-30 Surface Water - River 1139
2019-09-30 2019-10-04 Groundwater - Non-saline less than or equal to 150m deep 5535

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1915 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-13 No Incident Encountered 0.00 0.00
2019-10-20 No Incident Encountered 0.00 0.00

For data sources see[8]

References