X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0576012213000

Well Details

Well ID: 0576012213000
Loading map...
Location: 00/13-22-057-01W6/0
Location Alias: 00/13-22-57-01 W6M
Location Alias 2: 00/13-22-057-01 W6/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 6
Range: 01
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ SMOKY 13-22-57-1
Operator Name: Tourmaline Oil Corp.
License Number: 0493870
License Date: 2019-02-26
License Status: Issued
Spud Date: 2019-10-05
Final Drill Date: 2019-11-30
Well Total Depth: 5590.00 m
Surface Hole Latitude: 53.944045
Surface Hole Longitude: -118.038618

For data sources see[1][2]

Well History

Date Event
2019-02-26 Obtained License
2019-10-05 Set Surface
2019-10-06 Surface Casing Operation Performed
2019-10-11 Intermediate Casing Operation Performed
2019-11-10 Lost Circulation Occurred
2019-11-20 Well Log Performed
2019-11-21 Resumption
2019-11-23 Direction Drilling Operation Performed - Deviate
2019-11-25 Direction Drilling Operation Performed - Horizontal
2019-11-30 Finished Drilling
2019-11-30 Well Log Performed
2019-11-30 Well Mode changed to Drilled and Cased
2019-12-03 Production Casing Operation Performed
2019-12-03 Rig Released
2019-12-08 Well Log Performed
2019-12-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-29 Well Began Production
2019-12-29 Well Fluid changed to Gas
2019-12-29 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-10-05 Precision Drilling Corporation 531 Set Surface
2019-11-21 Precision Drilling Corporation 531 Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-11-23 3167.80 Deviate (5 - 79 degrees)
2019-11-25 3481.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-12-12 Multi-Stage Fracture 5538.30 5538.40 0
2019-12-12 Multi-Stage Fracture 5073.80 5073.90 0
2019-12-12 Multi-Stage Fracture 5021.00 5021.10 0
2019-12-12 Multi-Stage Fracture 4968.10 4968.20 0
2019-12-12 Multi-Stage Fracture 4915.20 4915.30 0
2019-12-12 Multi-Stage Fracture 4862.40 4862.50 0
2019-12-12 Multi-Stage Fracture 4809.50 4809.60 0
2019-12-12 Multi-Stage Fracture 4756.70 4756.80 0
2019-12-12 Multi-Stage Fracture 4703.80 4703.90 0
2019-12-13 Multi-Stage Fracture 4650.90 4651.00 0
2019-12-13 Multi-Stage Fracture 4598.00 4598.10 0
2019-12-12 Multi-Stage Fracture 5496.50 5496.60 0
2019-12-13 Multi-Stage Fracture 4545.10 4545.20 0
2019-12-13 Multi-Stage Fracture 4492.20 4492.30 0
2019-12-13 Multi-Stage Fracture 4439.30 4439.40 0
2019-12-13 Multi-Stage Fracture 4386.40 4386.50 0
2019-12-13 Multi-Stage Fracture 4333.60 4333.70 0
2019-12-13 Multi-Stage Fracture 4280.70 4280.80 0
2019-12-13 Multi-Stage Fracture 4227.80 4227.90 0
2019-12-13 Multi-Stage Fracture 4175.10 4175.20 0
2019-12-13 Multi-Stage Fracture 4122.50 4122.60 0
2019-12-13 Multi-Stage Fracture 4069.60 4069.70 0
2019-12-12 Multi-Stage Fracture 5443.60 5443.70 0
2019-12-13 Multi-Stage Fracture 4016.70 4016.80 0
2019-12-13 Multi-Stage Fracture 3963.90 3964.00 0
2019-12-13 Multi-Stage Fracture 3911.00 3911.10 0
2019-12-13 Multi-Stage Fracture 3858.60 3858.70 0
2019-12-13 Multi-Stage Fracture 3805.70 3805.80 0
2019-12-13 Multi-Stage Fracture 3752.80 3752.90 0
2019-12-13 Multi-Stage Fracture 3700.10 3700.20 0
2019-12-13 Multi-Stage Fracture 3647.30 3647.40 0
2019-12-13 Multi-Stage Fracture 3595.10 3595.20 0
2019-12-13 Multi-Stage Fracture 3542.20 3542.30 0
2019-12-12 Multi-Stage Fracture 5390.80 5390.90 0
2019-12-13 Multi-Stage Fracture 3489.30 3489.40 0
2019-12-12 Multi-Stage Fracture 5337.90 5338.00 0
2019-12-12 Multi-Stage Fracture 5285.00 5285.10 0
2019-12-12 Multi-Stage Fracture 5232.10 5232.20 0
2019-12-12 Multi-Stage Fracture 5179.30 5179.40 0
2019-12-12 Multi-Stage Fracture 5126.40 5126.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-12-12 2019-12-13 3,377 8,815 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.8201 N/A
Sand - Tier 1 40/70 Trican silica crystalline 14808-60-7 100 11.2722 N/A
Sand - Tier 2 50/140 Trican silica crystalline 14808-60-7 100 1.9068 N/A
WayProp (40/70) Trican phenolic resin 9003-35-4 100 3.8137 N/A
silica crystalline 14808-60-7 100 3.8137 N/A
Aqucar DB20 Biocide Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0104 N/A
dibromoacetonitrile 3252-43-5 100 0.0104 N/A
non-hazardous ingredients Not Available 100 0.0104 N/A
polyethylene glycol 25322-68-3 100 0.0104 N/A
sodium bromide 7647-15-6 100 0.0104 N/A
CC-7 Clay Stabilizer Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0889 N/A
water Not Available 100 0.0889 N/A
FR-22 Concentrated Friction Reducer Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0465 N/A
non-hazardous ingredients Not Available 100 0.0465 N/A
S-17X Surfactant Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0408 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0408 N/A
methanol 67-56-1 100 0.0408 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0408 N/A
non-hazardous ingredients Not Available 100 0.0408 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-12-12 2019-12-16 Groundwater - Non-saline less than or equal to 150m deep 8815

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 18 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-11-10 Lost Circulation 1140.00 2202.00
2019-12-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References