If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0584230206002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.982546,"lon":-113.297141,"icon":""}]} |
Location: 00/06-02-058-23W4/2 | |
Location Alias: 00/06-02-58-23 W4M | |
Location Alias 2: 00/06-02-058-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 4 | |
Range: 23 | |
Section: 02 | |
County/Municipality: Thorhild County | |
Well Name: SURE ENERGY HZ REDWATER 6-2-58-23 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0421527 | |
License Date: 2010-06-30 | |
License Status: Suspension | |
Spud Date: 2010-07-22 | |
Final Drill Date: 2010-08-06 | |
Well Total Depth: 1854.00 m | |
Surface Hole Latitude: 53.982546 | |
Surface Hole Longitude: -113.297141 |
Date | Event |
---|---|
2010-06-30 | Obtained License |
2010-07-24 | Direction Drilling Operation Performed - Horizontal |
2010-07-24 | Surface Casing Operation Performed |
2010-07-26 | Production Casing Operation Performed |
2010-08-02 | Direction Drilling Operation Performed - Horizontal |
2010-08-06 | Finished Drilling |
2010-08-06 | Well Structure changed to Drain |
2010-08-07 | Well Log Performed |
2010-08-09 | Perforation Treatment Performed - Open-Hole Completion |
2010-08-09 | Rig Released |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-07-24 | 470.00 | Horizontal |
2010-08-02 | 965.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-08-09 | Open Hole/Barefoot Completion | 923.00 | 1854.00 | 0 |
For data sources see[5]