If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0585060307000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.981538,"lon":-114.801865,"icon":""}]} |
Location: 00/07-03-058-06W5/0 | |
Location Alias: 00/07-03-58-06 W5M | |
Location Alias 2: 00/07-03-058-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 5 | |
Range: 06 | |
Section: 03 | |
County/Municipality: Lac Ste. Anne County | |
Well Name: FMEL HELDAR 7-3-58-6 | |
Operator Name: Point Loma Resources Ltd. | |
License Number: 0081224 | |
License Date: 1980-02-19 | |
License Status: Suspension | |
Spud Date: 1980-02-24 | |
Final Drill Date: 1980-03-09 | |
Well Total Depth: 1380.00 m | |
Surface Hole Latitude: 53.981538 | |
Surface Hole Longitude: -114.801865 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-02-19 | Obtained License |
1980-03-07 | Kick Occurred |
1980-03-09 | Finished Drilling |
1980-03-10 | Kick Occurred |
1980-03-13 | Kick Occurred |
1980-03-16 | Production Casing Operation Performed |
1980-03-24 | Well Log Performed |
1980-03-26 | Perforation Treatment Performed - Jet Perforation |
1980-03-27 | Perforation Treatment Performed - Acid Wash - No Pressure |
1980-03-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-03-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-04-02 | Perforation Treatment Performed - Jet Perforation |
1980-04-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-04-19 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
1980-04-22 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
1980-04-23 | Perforation Treatment Performed - Chemical Squeeze |
1980-04-27 | Perforation Treatment Performed - Jet Perforation |
1980-05-02 | Perforation Treatment Performed - Jet Perforation |
1980-05-02 | Well Mode changed to Drilled and Cased |
1980-05-05 | Well Fluid changed to Gas |
1980-05-05 | Well Mode changed to Testing |
2007-03-24 | Perforation Treatment Performed - Cement Squeeze |
2007-03-24 | Plug Back Performed |
2008-11-01 | Well Fluid changed to Gas |
2008-11-01 | Well Mode changed to Test Completed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-03-26 | Perforation | 1293.30 | 1295.00 | 6 |
1980-04-22 | Casing Patch | 1301.00 | 1303.00 | 0 |
1980-04-23 | Chemical Squeeze | 1319.00 | 1341.00 | 0 |
1980-04-27 | Perforation | 1279.50 | 1280.50 | 7 |
1980-05-02 | Perforation | 1085.00 | 1086.00 | 7 |
2007-03-24 | Cement Squeeze | 1085.00 | 1086.00 | 0 |
1980-03-26 | Perforation | 1319.00 | 1322.00 | 6 |
1980-03-26 | Perforation | 1340.00 | 1341.00 | 6 |
1980-03-27 | Acid Wash | 1293.30 | 1341.00 | 0 |
1980-03-28 | Acid Treatment | 1293.30 | 1341.00 | 0 |
1980-03-29 | Acid Treatment | 1319.00 | 1322.00 | 0 |
1980-04-02 | Perforation | 1301.00 | 1303.00 | 7 |
1980-04-03 | Acid Treatment | 1301.00 | 1303.00 | 0 |
1980-04-19 | Casing Patch | 1293.30 | 1295.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 1 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1980-03-07 | Kick | 1280.00 | 1280.00 |
1980-03-10 | Kick | 1380.00 | 1380.00 |
1980-03-13 | Kick | 1380.00 | 1380.00 |
For data sources see[6]