If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0585062002024 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.022412,"lon":-114.871935,"icon":""}]} |
Location: 02/02-20-058-06W5/4 | |
Location Alias: 02/02-20-58-06 W5M | |
Location Alias 2: 02/02-20-058-06 W5/04 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 5 | |
Range: 06 | |
Section: 20 | |
County/Municipality: Lac Ste. Anne County | |
Well Name: 981384 HZ HELDAR 2-20-58-6 | |
Operator Name: Trident Exploration (Alberta) Corp. | |
License Number: 0357636 | |
License Date: 2006-05-19 | |
License Status: Suspension | |
Spud Date: 2006-07-13 | |
Final Drill Date: 2006-08-06 | |
Well Total Depth: 2411.00 m | |
Surface Hole Latitude: 54.022412 | |
Surface Hole Longitude: -114.871935 |
Date | Event |
---|---|
2006-05-19 | Obtained License |
2006-07-14 | Surface Casing Operation Performed |
2006-07-16 | Direction Drilling Operation Performed - Horizontal |
2006-07-18 | Intermediate Casing Operation Performed |
2006-08-01 | Direction Drilling Operation Performed - Horizontal |
2006-08-01 | Liner Casing Operation Performed |
2006-08-06 | Finished Drilling |
2006-08-06 | Perforation Treatment Performed - Open-Hole Completion |
2006-08-06 | Perforation Treatment Performed - Slotted Liner or Casing |
2006-08-06 | Well Log Performed |
2006-08-06 | Well Structure changed to Drain |
2006-08-08 | Rig Released |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2006-07-16 | 910.00 | Horizontal |
2006-08-01 | 1245.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-08-06 | Slotted Liner | 1245.00 | 2352.40 | 0 |
2006-08-06 | Open Hole/Barefoot Completion | 2352.40 | 2411.00 | 0 |
For data sources see[5]