X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585241011002

Well Details

Well ID: 0585241011002
Loading map...
Location: 00/11-10-058-24W5/2
Location Alias: 00/11-10-58-24 W5M
Location Alias 2: 00/11-10-058-24 W5/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 24
Section: 10
County/Municipality: Yellowhead County
Well Name: TALISMAN W BERLAND RIVER 11-10-58-24
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0033110
License Date: 1967-11-23
License Status: Suspension
Spud Date: 1967-12-15
Final Drill Date: 1968-07-27
Well Total Depth: 4054.10 m
Surface Hole Latitude: 54.001874
Surface Hole Longitude: -117.487215

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-11-23 Obtained License
1967-12-15 Direction Drilling Operation Performed - 98
1968-01-15 Drill Stem Test Performed
1968-02-18 Blowout Occurred
1968-07-27 Finished Drilling
1968-07-27 Well Mode changed to Drilled and Cased
1968-07-30 Drill Stem Test Performed
1968-07-31 Drill Stem Test Performed
1968-08-04 Liner Casing Operation Performed
1968-08-07 Perforation Treatment Performed - Jet Perforation
1968-08-08 Drill Stem Test Performed
1968-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-08-10 Perforation Treatment Performed - Jet Perforation
1968-08-12 Drill Stem Test Performed
1968-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-08-14 Perforation Treatment Performed - Jet Perforation
1968-08-16 Drill Stem Test Performed
1968-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-08-18 Perforation Treatment Performed - Jet Perforation
1968-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-07-22 Well Log Performed
2008-07-24 Perforation Treatment Performed - Jet Perforation
2008-07-25 Perforation Treatment Performed - Cement Plug
2009-02-01 Well Began Production
2009-02-01 Well Fluid changed to Gas
2009-02-01 Well Mode changed to Flowing
2013-08-28 Well Fluid changed to Gas
2013-08-28 Well Mode changed to Pumping
2016-12-03 Well Log Performed
2016-12-09 Well Fluid changed to Gas
2016-12-09 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1967-12-15 3313.20 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-08-07 Perforation 3964.80 3970.90 7
1968-08-18 Perforation 3797.80 3803.90 7
1968-08-29 Acid Treatment 3819.80 3828.90 0
1968-09-03 Acid Treatment 3797.80 3803.90 0
2008-07-24 Perforation 3560.10 3565.60 20
2008-07-24 Perforation 3550.90 3558.20 20
2008-07-24 Perforation 3538.70 3546.00 20
2008-07-24 Perforation 3506.10 3513.10 20
2008-07-25 Cement Plug 3626.00 3787.00 0
1968-08-10 Packing Device Capped w/Cement 3950.20 3950.20 0
1968-08-10 Perforation 3883.80 3889.20 7
1968-08-10 Perforation 3874.60 3878.90 7
1968-08-14 Perforation 3832.60 3833.80 7
1968-08-14 Perforation 3841.10 3848.40 7
1968-08-14 Packing Device Capped w/Cement 3871.00 3871.00 0
1968-08-18 Packing Device Capped w/Cement 3851.50 3851.50 0
1968-08-18 Perforation 3819.80 3828.90 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 5571 0.0 0.0 0.0
2010 943 0.0 0.0 0.0
2011 7320 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8567 0.0 0.0 0.0
2014 8526 0.0 0.0 0.0
2015 2665 0.0 0.0 0.0
2016 24 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1968-02-18 Blowout 3559.90 3559.90
2016-12-03 No Incident Encountered 0.00 0.00

For data sources see[7]

References