X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585271216000

Well Details

Well ID: 0585271216000
Loading map...
Location: 00/16-12-058-27W5/0
Location Alias: 00/16-12-58-27 W5M
Location Alias 2: 00/16-12-058-27 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 27
Section: 12
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE LELAND 16-12-58-27
Operator Name: Tourmaline Oil Corp.
License Number: 0325353
License Date: 2005-01-31
License Status: Issued
Spud Date: 2005-02-26
Final Drill Date: 2005-03-16
Well Total Depth: 3256.00 m
Surface Hole Latitude: 54.003159
Surface Hole Longitude: -117.872089

For data sources see[1][2]

Well History

Date Event
2005-01-31 Obtained License
2005-03-01 Surface Casing Operation Performed
2005-03-09 Direction Drilling Operation Performed - Deviate
2005-03-16 Finished Drilling
2005-03-16 Well Log Performed
2005-03-16 Well Mode changed to Drilled and Cased
2005-03-17 Well Log Performed
2005-03-18 Production Casing Operation Performed
2005-03-19 Rig Released
2009-02-24 Perforation Treatment Performed - Jet Perforation
2009-02-27 Perforation Treatment Performed - Fractured
2009-02-28 Perforation Treatment Performed - Jet Perforation
2009-03-01 Perforation Treatment Performed - Fractured
2009-04-01 Well Began Production
2009-04-01 Well Fluid changed to Gas
2009-04-01 Well Mode changed to Flowing
2011-02-16 Well Fluid changed to Gas
2011-02-16 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-03-09 2337.50 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-24 Perforation 3230.50 3231.50 20
2009-02-27 Fracture 3230.50 3231.50 0
2009-02-28 Perforation 3041.00 3041.50 5
2009-02-28 Perforation 3034.00 3034.50 5
2009-02-28 Perforation 2959.50 2960.00 4
2009-02-28 Perforation 2822.00 2822.50 6
2009-02-28 Perforation 2662.00 2662.50 4
2009-02-28 Perforation 2624.50 2625.00 4
2009-03-01 Fracture 2624.50 3041.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 5643 0.0 0.0 0.0
2010 7310 0.0 0.0 0.0
2011 8235 0.0 0.0 0.0
2012 8394 0.0 0.0 0.0
2013 7617 0.0 0.0 0.0
2014 6588 0.0 0.0 0.0
2015 7892 0.0 0.0 0.0
2016 8232 0.0 0.0 0.0
2017 8706 0.0 0.0 0.0
2018 8257 0.0 0.0 0.0
2019 7264 0.0 0.0 0.0

For data sources see[6]

References