If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0586042011002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.03152,"lon":-118.562383,"icon":""}]} |
Location: 00/11-20-058-04W6/2 | |
Location Alias: 00/11-20-58-04 W6M | |
Location Alias 2: 00/11-20-058-04 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 6 | |
Range: 04 | |
Section: 20 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: OEI MOBER 11-20-58-4 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0081595 | |
License Date: 1980-03-10 | |
License Status: Suspension | |
Spud Date: 1980-03-21 | |
Final Drill Date: 1980-08-01 | |
Well Total Depth: 4010.00 m | |
Surface Hole Latitude: 54.031520 | |
Surface Hole Longitude: -118.562383 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-03-10 | Obtained License |
1980-04-06 | Lost Circulation Occurred |
1980-05-04 | Lost Circulation Occurred |
1980-05-09 | Lost Circulation Occurred |
1980-05-15 | Lost Circulation Occurred |
1980-05-21 | Lost Circulation Occurred |
1980-06-10 | Well Log Performed |
1980-06-21 | Lost Circulation Occurred |
1980-08-01 | Finished Drilling |
1980-08-19 | Liner Casing Operation Performed |
1980-09-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-09-12 | Perforation Treatment Performed - Jet Perforation |
1980-09-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-09-19 | Perforation Treatment Performed - Jet Perforation |
1980-09-22 | Perforation Treatment Performed - Fractured |
1980-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-10-01 | Perforation Treatment Performed - Jet Perforation |
1980-10-06 | Perforation Treatment Performed - Fractured |
1981-09-05 | Well Log Performed |
1987-05-29 | Perforation Treatment Performed - Cement Squeeze |
1987-05-29 | Plug Back Performed |
1987-05-30 | Perforation Treatment Performed - Jet Perforation |
1987-06-03 | Perforation Treatment Performed - Fractured |
1987-06-03 | Perforation Treatment Performed - Jet Perforation |
1987-06-09 | Well Log Performed |
1987-06-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-06-11 | Plug Back Performed |
1987-06-12 | Well Log Performed |
1987-06-13 | Perforation Treatment Performed - Jet Perforation |
1987-06-13 | Well Log Performed |
1987-06-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-06-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-06-14 | Perforation Treatment Performed - Cement Squeeze |
1987-06-14 | Plug Back Performed |
1987-06-15 | Perforation Treatment Performed - Jet Perforation |
1987-06-15 | Well Log Performed |
1987-06-16 | Perforation Treatment Performed - Fractured |
1987-06-22 | Well Log Performed |
1987-07-30 | Well Mode changed to Drilled and Cased |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-09-12 | Perforation | 3992.00 | 3995.00 | 13 |
1987-05-30 | Perforation | 2679.00 | 2689.00 | 13 |
1987-06-03 | Perforation | 2679.00 | 2689.00 | 13 |
1987-06-03 | Fracture | 2679.00 | 2689.00 | 0 |
1987-06-11 | Packing Device Capped w/Cement | 2662.00 | 2670.00 | 0 |
1987-06-11 | Packing Device Capped w/Cement | 2622.00 | 2630.00 | 0 |
1987-06-13 | Perforation | 2350.00 | 2351.00 | 13 |
1987-06-14 | Acid Treatment | 2350.00 | 2351.00 | 0 |
1987-06-14 | Cement Squeeze | 2350.00 | 2351.00 | 0 |
1987-06-14 | Packing Device Capped w/Cement | 2338.20 | 2346.00 | 0 |
1987-06-15 | Perforation | 2288.50 | 2300.50 | 13 |
1980-09-12 | Acid Treatment | 3992.00 | 3995.00 | 0 |
1987-06-16 | Fracture | 2288.50 | 2300.50 | 0 |
1980-09-17 | Packing Device Capped w/Cement | 3020.00 | 3028.00 | 0 |
1980-09-19 | Perforation | 2679.00 | 2689.00 | 13 |
1980-09-22 | Fracture | 2679.00 | 2689.00 | 0 |
1980-09-29 | Packing Device Capped w/Cement | 2674.50 | 2677.00 | 0 |
1980-10-01 | Perforation | 2637.00 | 2641.00 | 13 |
1980-10-06 | Fracture | 2637.00 | 2641.00 | 0 |
1987-05-29 | Cement Squeeze | 2637.00 | 2641.00 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1980-04-06 | Lost Circulation | 1048.00 | 1238.00 |
1980-05-04 | Lost Circulation | 1878.00 | 1900.00 |
1980-05-09 | Lost Circulation | 2060.00 | 2071.00 |
1980-05-15 | Lost Circulation | 2195.00 | 2198.00 |
1980-05-21 | Lost Circulation | 2496.00 | 2510.00 |
1980-06-21 | Lost Circulation | 3200.00 | 3200.00 |
For data sources see[5]