X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0594022613000

Well Details

Well ID: 0594022613000
Loading map...
Location: 00/13-26-059-02W4/0
Location Alias: 00/13-26-59-02 W4M
Location Alias 2: 00/13-26-059-02 W4/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 4
Range: 02
Section: 26
County/Municipality: Elizabeth Metis Settlement
Well Name: CNRL CHANDLER 13-26-59-2
Operator Name: Canadian Natural Resources Limited
License Number: 0117719
License Date: 1985-09-18
License Status: Abandoned
Spud Date: 1985-09-28
Final Drill Date: 1985-10-02
Well Total Depth: 511.00 m
Surface Hole Latitude: 54.133841
Surface Hole Longitude: -110.200181

For data sources see[1][2]

Well History

Date Event
1985-09-18 Obtained License
1985-09-29 Surface Casing Operation Performed
1985-10-02 Finished Drilling
1985-10-02 Production Casing Operation Performed
1985-10-02 Well Log Performed
1985-10-02 Well Mode changed to Drilled and Cased
1985-10-03 Rig Released
1985-10-09 Well Log Performed
1986-01-29 Perforation Treatment Performed - Jet Perforation
1986-01-29 Well Log Performed
1986-01-30 Well Began Production
1986-01-30 Well Fluid changed to Crude Bitumen
1986-01-30 Well Mode changed to Pumping
1987-02-20 Well Fluid changed to Crude Bitumen
1987-02-20 Well Mode changed to Suspended
1990-08-01 Well Fluid changed to Crude Bitumen
1990-08-01 Well Mode changed to Pumping
1993-03-01 Well Fluid changed to Crude Bitumen
1993-03-01 Well Mode changed to Suspended
2006-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-04 Perforation Treatment Performed - Cement Plug
2006-06-04 Plug Back Performed
2006-06-04 Well Fluid changed to Crude Bitumen
2006-06-04 Well Mode changed to Abandoned Zone
2006-06-09 Well Abandoned
2006-06-09 Well Fluid changed to Crude Bitumen
2006-06-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-01-29 Perforation 412.20 417.00 26
2006-06-04 Cement Plug 402.00 498.00 0
2006-06-04 Packing Device Capped w/Cement 391.00 399.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 822 0.0 0.0 0.0

For data sources see[5]

References