If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0594031916000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.120456,"lon":-110.431573,"icon":""}]} |
Location: 00/16-19-059-03W4/0 | |
Location Alias: 00/16-19-59-03 W4M | |
Location Alias 2: 00/16-19-059-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 4 | |
Range: 03 | |
Section: 19 | |
County/Municipality: Municipal District of Bonnyville No. 87 | |
Well Name: COGI REITA 16-19-59-3 | |
Operator Name: DEL Canada GP Ltd. | |
License Number: 0150174 | |
License Date: 1991-09-27 | |
License Status: Suspension | |
Spud Date: 1991-10-01 | |
Final Drill Date: 1991-10-04 | |
Well Total Depth: 500.00 m | |
Surface Hole Latitude: 54.120456 | |
Surface Hole Longitude: -110.431573 |
Date | Event |
---|---|
1991-09-27 | Obtained License |
1991-10-02 | Surface Casing Operation Performed |
1991-10-04 | Finished Drilling |
1991-10-04 | Well Log Performed |
1991-10-04 | Well Mode changed to Drilled and Cased |
1991-10-05 | Production Casing Operation Performed |
1991-10-05 | Rig Released |
1991-10-08 | Perforation Treatment Performed - Jet Perforation |
1991-10-08 | Well Began Production |
1991-10-08 | Well Fluid changed to Crude Bitumen |
1991-10-08 | Well Mode changed to Pumping |
1992-08-01 | Well Fluid changed to Crude Bitumen |
1992-08-01 | Well Mode changed to Suspended |
1994-06-29 | Well Log Performed |
1994-06-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-06-30 | Perforation Treatment Performed - Jet Perforation |
1994-06-30 | Plug Back Performed |
1994-06-30 | Well Fluid changed to Crude Bitumen |
1994-06-30 | Well Mode changed to Abandoned Zone |
2007-03-10 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1991-10-08 | Perforation | 450.00 | 454.50 | 7 |
1994-06-30 | Packing Device Capped w/Cement | 432.00 | 440.00 | 0 |
1994-06-30 | Perforation | 386.00 | 387.00 | 13 |
2007-03-10 | Perforation | 409.80 | 410.40 | 17 |
2007-03-10 | Perforation | 412.00 | 412.50 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1992 | 1242 | 0.0 | 0.0 | 0.0 |
For data sources see[5]