If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0594070204000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.066828,"lon":-110.949934,"icon":""}]} |
Location: 00/04-02-059-07W4/0 | |
Location Alias: 00/04-02-59-07 W4M | |
Location Alias 2: 00/04-02-059-07 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 4 | |
Range: 07 | |
Section: 02 | |
County/Municipality: Municipal District of Bonnyville No. 87 | |
Well Name: RIFE ET AL STEVE 4-2-59-7 | |
Operator Name: Rife Resources Ltd. | |
License Number: 0410488 | |
License Date: 2009-05-14 | |
License Status: Abandoned | |
Spud Date: 2009-06-02 | |
Final Drill Date: 2009-06-04 | |
Well Total Depth: 492.00 m | |
Surface Hole Latitude: 54.066828 | |
Surface Hole Longitude: -110.949934 |
Date | Event |
---|---|
2009-05-14 | Obtained License |
2009-06-03 | Surface Casing Operation Performed |
2009-06-04 | Finished Drilling |
2009-06-04 | Production Casing Operation Performed |
2009-06-04 | Rig Released |
2009-06-04 | Well Log Performed |
2009-06-04 | Well Mode changed to Drilled and Cased |
2009-07-21 | Perforation Treatment Performed - Jet Perforation |
2009-07-21 | Well Began Production |
2009-07-21 | Well Fluid changed to Crude Bitumen |
2009-07-21 | Well Mode changed to Pumping |
2018-01-01 | Well Fluid changed to Crude Bitumen |
2018-01-01 | Well Mode changed to Suspended |
2019-05-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-05-29 | Plug Back Performed |
2019-05-29 | Well Fluid changed to Crude Bitumen |
2019-05-29 | Well Mode changed to Abandoned Zone |
2019-09-25 | Well Abandoned |
2019-09-25 | Well Fluid changed to Crude Bitumen |
2019-09-25 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-07-21 | Perforation | 462.00 | 465.50 | 26 |
2019-05-29 | Packing Device Capped w/Cement | 439.80 | 447.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 3596 | 0.0 | 0.0 | 0.0 |
2010 | 8595 | 0.0 | 0.0 | 0.0 |
2011 | 8633 | 0.0 | 0.0 | 0.0 |
2012 | 8727 | 0.0 | 0.0 | 0.0 |
2013 | 8699 | 0.0 | 0.0 | 0.0 |
2014 | 7188 | 0.0 | 0.0 | 0.0 |
2015 | 2587 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-05-28 | No Incident Encountered | 0.00 | 0.00 |
2019-05-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]