X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0594170907002

Well Details

Well ID: 0594170907002
Loading map...
Location: 00/07-09-059-17W4/2
Location Alias: 00/07-09-59-17 W4M
Location Alias 2: 00/07-09-059-17 W4/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 4
Range: 17
Section: 09
County/Municipality: Smoky Lake County
Well Name: PCP SMOKY 7-9-59-17
Operator Name: Sunoma Energy Corp.
License Number: 0042915
License Date: 1972-07-05
License Status: RecCertified
Spud Date: 1972-07-07
Final Drill Date: 1972-07-11
Well Total Depth: 742.50 m
Surface Hole Latitude: 54.083897
Surface Hole Longitude: -112.482968

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-07-05 Obtained License
1972-07-10 Lost Circulation Occurred
1972-07-11 Finished Drilling
1972-07-13 Drill Stem Test Performed
1972-07-14 Drill Stem Test Performed
1972-07-15 Production Casing Operation Performed
1974-11-08 Perforation Treatment Performed - Jet Perforation
1974-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-03-21 Perforation Treatment Performed - Jet Perforation
1975-03-22 Well Mode changed to Drilled and Cased
1976-05-17 Well Began Production
1976-05-17 Well Fluid changed to Gas
1976-05-17 Well Mode changed to Flowing
1981-12-18 Well Fluid changed to Gas
1981-12-18 Well Mode changed to Suspended
1989-11-18 Well Log Performed
1989-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-11-19 Plug Back Performed
1989-11-19 Well Abandoned
1989-11-19 Well Fluid changed to Gas
1989-11-19 Well Mode changed to Abandoned
1990-02-22 Well Log Performed
1990-02-23 Perforation Treatment Performed - Jet Perforation
1990-02-23 Perforation Treatment Performed - Remedial Casing
1990-05-24 Well Log Performed
1990-06-12 Well Log Performed
1990-06-13 Perforation Treatment Performed - Jet Perforation
1990-06-13 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-11-08 Perforation 661.40 662.90 13
1974-11-09 Acid Treatment 661.40 662.90 0
1975-03-21 Perforation 588.00 589.80 13
1989-11-19 Packing Device Capped w/Cement 651.00 659.00 0
1989-11-19 Packing Device Capped w/Cement 577.00 585.00 0
1990-02-23 Perforation 499.00 500.00 13
1990-02-23 Remedial Casing Cementing 499.00 500.00 0
1990-06-13 Perforation 374.00 375.00 13
1990-06-13 Remedial Casing Cementing 374.00 375.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 4764 0.0 0.0 0.0
1977 613 0.0 0.0 0.0
1978 1622 0.0 0.0 0.0
1979 2175 0.0 0.0 0.0
1980 2104 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1972-07-10 Lost Circulation 693.40 693.40

For data sources see[6]

References