If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0594252010000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.118337,"lon":-113.708294,"icon":""}]} |
| Location: 00/10-20-059-25W4/0 | |
| Location Alias: 00/10-20-59-25 W4M | |
| Location Alias 2: 00/10-20-059-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 059 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 20 | |
| County/Municipality: Westlock County | |
| Well Name: SIGNALTA WLOCK 10-20-59-25 | |
| Operator Name: Signalta Resources Limited | |
| License Number: 0134242 | |
| License Date: 1988-06-09 | |
| License Status: Abandoned | |
| Spud Date: 1988-06-16 | |
| Final Drill Date: 1988-06-20 | |
| Well Total Depth: 1220.00 m | |
| Surface Hole Latitude: 54.118337 | |
| Surface Hole Longitude: -113.708294 |
| Date | Event |
|---|---|
| 1988-06-09 | Obtained License |
| 1988-06-16 | Surface Casing Operation Performed |
| 1988-06-20 | Finished Drilling |
| 1988-06-20 | Well Log Performed |
| 1988-06-20 | Well Mode changed to Drilled and Cased |
| 1988-06-21 | Drill Stem Test Performed |
| 1988-06-22 | Drill Stem Test Performed |
| 1988-06-22 | Plug Back Performed |
| 1988-06-23 | Production Casing Operation Performed |
| 1988-06-24 | Rig Released |
| 1988-07-25 | Perforation Treatment Performed - Jet Perforation |
| 1988-07-25 | Well Log Performed |
| 1988-07-26 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1988-07-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1988-07-27 | Plug Back Performed |
| 1988-07-28 | Perforation Treatment Performed - Jet Perforation |
| 1988-07-28 | Well Log Performed |
| 1988-11-03 | Well Began Production |
| 1988-11-03 | Well Fluid changed to Gas |
| 1988-11-03 | Well Mode changed to Flowing |
| 2003-01-13 | Well Fluid changed to Gas |
| 2003-01-13 | Well Mode changed to Suspended |
| 2005-10-20 | Perforation Treatment Performed - Fractured |
| 2005-10-25 | Well Fluid changed to Gas |
| 2005-10-25 | Well Mode changed to Flowing |
| 2007-02-28 | Well Fluid changed to Gas |
| 2007-02-28 | Well Mode changed to Suspended |
| 2008-09-10 | Well Fluid changed to Gas |
| 2008-09-10 | Well Mode changed to Flowing |
| 2008-10-09 | Well Fluid changed to Gas |
| 2008-10-09 | Well Mode changed to Suspended |
| 2015-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2015-09-14 | Perforation Treatment Performed - Jet Perforation |
| 2015-09-14 | Plug Back Performed |
| 2015-09-14 | Well Fluid changed to Gas |
| 2015-09-14 | Well Log Performed |
| 2015-09-14 | Well Mode changed to Abandoned Zone |
| 2015-09-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2015-09-15 | Perforation Treatment Performed - Remedial Casing |
| 2016-02-03 | Well Abandoned |
| 2016-02-03 | Well Fluid changed to Gas |
| 2016-02-03 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1988-07-25 | Perforation | 974.50 | 979.00 | 14 |
| 1988-07-26 | Acid Wash | 974.50 | 979.00 | 0 |
| 1988-07-27 | Packing Device Capped w/Cement | 965.50 | 973.50 | 0 |
| 1988-07-28 | Perforation | 958.50 | 962.00 | 14 |
| 2005-10-20 | Fracture | 958.50 | 962.00 | 0 |
| 2015-09-14 | Packing Device Capped w/Cement | 942.00 | 950.00 | 0 |
| 2015-09-14 | Perforation | 330.80 | 331.80 | 13 |
| 2015-09-15 | Remedial Casing Cementing | 330.80 | 331.80 | 0 |
| 2015-09-15 | Packing Device Capped w/Cement | 300.00 | 325.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1988 | 1407 | 0.0 | 0.0 | 0.0 |
| 1989 | 7046 | 0.0 | 0.0 | 0.0 |
| 1990 | 7217 | 0.0 | 0.0 | 0.0 |
| 1991 | 6668 | 0.0 | 0.0 | 0.0 |
| 1992 | 6082 | 0.0 | 0.0 | 0.0 |
| 1993 | 8628 | 0.0 | 0.0 | 0.0 |
| 1994 | 8462 | 0.0 | 0.0 | 0.0 |
| 1995 | 8581 | 0.0 | 0.0 | 0.0 |
| 1996 | 7686 | 0.0 | 0.0 | 0.0 |
| 1997 | 8731 | 0.0 | 0.0 | 0.0 |
| 1998 | 8466 | 0.0 | 0.0 | 0.0 |
| 1999 | 8718 | 0.0 | 0.0 | 0.0 |
| 2000 | 7188 | 0.0 | 0.0 | 0.0 |
| 2001 | 7034 | 0.0 | 0.0 | 0.0 |
| 2002 | 8201 | 0.0 | 0.0 | 0.0 |
| 2003 | 731 | 0.0 | 0.0 | 0.0 |
| 2005 | 806 | 0.0 | 0.0 | 0.0 |
| 2006 | 717 | 0.0 | 0.0 | 0.0 |
| 2008 | 1411 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-09-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]