If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0595062009003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.119073,"lon":-114.856897,"icon":""}]} |
| Location: 00/09-20-059-06W5/3 | |
| Location Alias: 00/09-20-59-06 W5M | |
| Location Alias 2: 00/09-20-059-06 W5/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 059 | |
| Meridian: 5 | |
| Range: 06 | |
| Section: 20 | |
| County/Municipality: Lac Ste. Anne County | |
| Well Name: ANDEX DALCO ET AL THUNDER 9-20-59-6 | |
| Operator Name: InPlay Oil Corp. | |
| License Number: 0082988 | |
| License Date: 1980-05-23 | |
| License Status: Suspension | |
| Spud Date: 1980-06-13 | |
| Final Drill Date: 1980-06-26 | |
| Well Total Depth: 1426.00 m | |
| Surface Hole Latitude: 54.119073 | |
| Surface Hole Longitude: -114.856897 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1980-05-23 | Obtained License |
| 1980-06-15 | Drill Stem Test Performed |
| 1980-06-18 | Drill Stem Test Performed |
| 1980-06-20 | Drill Stem Test Performed |
| 1980-06-22 | Drill Stem Test Performed |
| 1980-06-24 | Drill Stem Test Performed |
| 1980-06-26 | Finished Drilling |
| 1980-06-26 | Well Log Performed |
| 1980-06-26 | Well Mode changed to Drilled and Cased |
| 1980-06-28 | Drill Stem Test Performed |
| 1980-06-30 | Production Casing Operation Performed |
| 1980-07-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-07-26 | Perforation Treatment Performed - Jet Perforation |
| 1980-07-28 | Perforation Treatment Performed - Cement Squeeze |
| 1980-07-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-07-30 | Perforation Treatment Performed - Jet Perforation |
| 1980-10-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1981-01-25 | Perforation Treatment Performed - Jet Perforation |
| 1981-01-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1981-01-26 | Perforation Treatment Performed - Remedial Casing |
| 1985-06-10 | Well Log Performed |
| 1985-06-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1985-06-11 | Perforation Treatment Performed - Jet Perforation |
| 1985-06-11 | Plug Back Performed |
| 1985-06-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-07-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1992-07-06 | Plug Back Performed |
| 1992-07-06 | Well Log Performed |
| 1992-07-08 | Perforation Treatment Performed - Jet Perforation |
| 1992-07-08 | Well Log Performed |
| 1992-07-10 | Perforation Treatment Performed - Fractured |
| 1992-07-12 | Well Began Production |
| 1992-07-12 | Well Fluid changed to Crude Oil |
| 1992-07-12 | Well Mode changed to Pumping |
| 1992-10-01 | Well Fluid changed to Crude Oil |
| 1992-10-01 | Well Mode changed to Suspended |
| 1993-06-10 | Perforation Treatment Performed - Cement Squeeze |
| 1993-06-11 | Well Log Performed |
| 1993-06-13 | Perforation Treatment Performed - Jet Perforation |
| 1993-06-21 | Perforation Treatment Performed - Fractured |
| 1993-06-23 | Well Fluid changed to Crude Oil |
| 1993-06-23 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1980-07-26 | Perforation | 1262.60 | 1265.20 | 12 |
| 1981-01-26 | Remedial Casing Cementing | 1226.00 | 1227.00 | 0 |
| 1985-06-11 | Packing Device Capped w/Cement | 1232.00 | 1240.00 | 0 |
| 1985-06-11 | Perforation | 1219.50 | 1223.00 | 13 |
| 1985-06-12 | Acid Treatment | 1219.50 | 1223.00 | 0 |
| 1992-07-06 | Packing Device Capped w/Cement | 1210.00 | 1218.00 | 0 |
| 1992-07-08 | Perforation | 1020.00 | 1023.50 | 13 |
| 1992-07-10 | Fracture | 1020.00 | 1023.50 | 0 |
| 1993-06-10 | Cement Squeeze | 1020.00 | 1023.50 | 0 |
| 1993-06-13 | Perforation | 1183.00 | 1185.00 | 13 |
| 1993-06-21 | Fracture | 1183.00 | 1185.00 | 0 |
| 1980-07-26 | Perforation | 1268.40 | 1271.00 | 12 |
| 1980-07-26 | Acid Treatment | 1262.60 | 1271.00 | 0 |
| 1980-07-28 | Cement Squeeze | 1262.60 | 1271.00 | 0 |
| 1980-07-30 | Perforation | 1242.00 | 1253.00 | 6 |
| 1980-07-30 | Acid Treatment | 1242.00 | 1253.00 | 0 |
| 1980-10-16 | Acid Treatment | 1242.00 | 1253.00 | 0 |
| 1981-01-25 | Perforation | 1226.00 | 1227.00 | 6 |
| 1981-01-26 | Acid Treatment | 1226.00 | 1227.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1992 | 741 | 0.0 | 0.0 | 0.0 |
For data sources see[5]