X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595152002000

Well Details

Well ID: 0595152002000
Loading map...
Location: 00/02-20-059-15W5/0
Location Alias: 00/02-20-59-15 W5M
Location Alias 2: 00/02-20-059-15 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 15
Section: 20
County/Municipality: Woodlands County
Well Name: TIDEWATER WIND 2-20-59-15
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0020896
License Date: 1961-06-09
License Status: Abandoned
Spud Date: 1961-06-18
Final Drill Date: 1961-08-09
Well Total Depth: 2778.30 m
Surface Hole Latitude: 54.111557
Surface Hole Longitude: -116.211085

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-06-09 Obtained License
1961-07-04 Drill Stem Test Performed
1961-07-06 Lost Circulation Occurred
1961-08-09 Finished Drilling
1961-08-22 Production Casing Operation Performed
1961-08-25 Drill Stem Test Performed
1961-08-25 Perforation Treatment Performed - Bullet Perforation
1961-08-27 Perforation Treatment Performed - Cement Squeeze
1961-09-02 Perforation Treatment Performed - Bullet Perforation
1961-10-04 Perforation Treatment Performed - Jet Perforation
1961-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-08 Well Mode changed to Drilled and Cased
1964-01-31 Well Began Production
1964-01-31 Well Fluid changed to Gas
1964-01-31 Well Mode changed to Flowing
1964-08-11 Perforation Treatment Performed - Cement Squeeze
1964-08-24 Perforation Treatment Performed - Jet Perforation
1964-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-04 Perforation Treatment Performed - Cement Plug
1965-03-04 Well Fluid changed to Gas
1965-03-04 Well Mode changed to Abandoned Zone
1965-03-11 Perforation Treatment Performed - Jet Perforation
1965-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-08 Perforation Treatment Performed - Bullet Perforation
1965-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1965-09-09 Perforation Treatment Performed - Bullet Perforation
1965-09-10 Perforation Treatment Performed - Acid Wash - No Pressure
1965-09-10 Perforation Treatment Performed - Bullet Perforation
1965-09-11 Perforation Treatment Performed - Cement Plug
1965-09-17 Perforation Treatment Performed - Bullet Perforation
1965-09-17 Perforation Treatment Performed - Cement Squeeze
1965-09-21 Perforation Treatment Performed - Bullet Perforation
1965-09-30 Perforation Treatment Performed - Cement Squeeze
1974-09-21 Perforation Treatment Performed - Jet Perforation
1974-10-22 Perforation Treatment Performed - Cement Plug
1974-10-22 Perforation Treatment Performed - Cement Squeeze
1974-10-25 Perforation Treatment Performed - Jet Perforation
1974-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-29 Perforation Treatment Performed - Fractured
1974-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-19 Perforation Treatment Performed - Cement Squeeze
1978-07-22 Perforation Treatment Performed - Jet Perforation
1978-07-24 Perforation Treatment Performed - Acid Wash - No Pressure
1978-07-25 Perforation Treatment Performed - Cement Squeeze
1978-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-07-27 Perforation Treatment Performed - Acid Wash - No Pressure
1978-07-27 Perforation Treatment Performed - Jet Perforation
1978-07-29 Perforation Treatment Performed - Cement Plug
1978-08-01 Perforation Treatment Performed - Jet Perforation
1978-08-02 Perforation Treatment Performed - Acid Wash - No Pressure
1996-11-06 Well Log Performed
1996-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-28 Perforation Treatment Performed - Jet Perforation
1996-11-28 Plug Back Performed
1996-11-30 Perforation Treatment Performed - Remedial Casing
1996-11-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-08-25 Bullet Perforation 2228.10 2231.10 7
1965-03-04 Cement Plug 2732.50 2757.20 0
1965-03-11 Perforation 2228.40 2232.10 7
1965-03-17 Acid Treatment 2228.40 2232.10 0
1965-09-08 Bullet Perforation 2545.10 2545.40 16
1965-09-09 Packing Device Capped w/Cement 2529.80 2529.80 0
1965-09-09 Bullet Perforation 2347.00 2347.30 16
1965-09-09 Bullet Perforation 2343.90 2344.20 16
1965-09-10 Bullet Perforation 2343.90 2344.20 16
1965-09-10 Acid Wash 2343.90 2347.30 0
1965-09-11 Cement Plug 2309.50 2355.20 0
1961-08-27 Cement Squeeze 2228.10 2231.10 0
1965-09-17 Bullet Perforation 2228.40 2232.10 0
1965-09-17 Cement Squeeze 2228.40 2232.10 0
1965-09-21 Bullet Perforation 2228.10 2229.30 7
1965-09-30 Cement Squeeze 2228.10 2229.30 0
1974-09-21 Perforation 1734.30 1737.40 7
1974-09-21 Perforation 1740.40 1744.10 7
1974-10-22 Cement Squeeze 1734.30 1744.10 0
1974-10-22 Cement Plug 1738.90 1744.10 0
1974-10-25 Perforation 1734.90 1736.40 7
1974-10-28 Acid Treatment 1734.90 1736.40 0
1961-09-02 Bullet Perforation 2756.60 2757.20 13
1974-10-29 Acid Treatment 1734.90 1736.40 0
1974-10-29 Fracture 1734.90 1736.40 0
1974-11-01 Acid Treatment 1734.90 1736.40 0
1978-07-19 Cement Squeeze 1734.90 1736.40 0
1978-07-22 Perforation 2147.30 2148.80 3
1978-07-24 Acid Wash 2147.30 2148.80 0
1978-07-25 Cement Squeeze 2147.30 2148.80 0
1978-07-26 Packing Device Capped w/Cement 2146.60 2194.60 0
1978-07-27 Perforation 2141.50 2143.40 7
1978-07-27 Acid Wash 2141.50 2143.40 0
1961-10-04 Perforation 2747.80 2757.20 7
1978-07-29 Cement Plug 2140.30 2146.60 0
1978-08-01 Perforation 2132.40 2133.60 7
1978-08-01 Perforation 2135.70 2136.30 7
1978-08-02 Acid Wash 2132.40 2136.30 0
1996-11-28 Packing Device Capped w/Cement 2112.20 2120.20 0
1996-11-28 Perforation 615.00 615.50 13
1996-11-30 Remedial Casing Cementing 615.00 615.50 0
1996-11-30 Remedial Casing Cementing 615.00 615.50 0
1961-10-11 Acid Treatment 2747.80 2757.20 0
1964-08-11 Cement Squeeze 2747.80 2757.20 0
1964-08-24 Perforation 2749.30 2753.00 0
1964-08-27 Acid Treatment 2749.30 2753.00 0
1964-09-14 Acid Treatment 2749.30 2753.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1961-07-06 Lost Circulation 2151.60 2151.60

For data sources see[6]

References