X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595153410000

Well Details

Well ID: 0595153410000
Loading map...
Location: 00/10-34-059-15W5/0
Location Alias: 00/10-34-59-15 W5M
Location Alias 2: 00/10-34-059-15 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 15
Section: 34
County/Municipality: Woodlands County
Well Name: TIDEWATER WIND 10-34-59-15
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0014619
License Date: 1958-01-21
License Status: Suspension
Spud Date: 1958-02-01
Final Drill Date: 1958-04-30
Well Total Depth: 2674.00 m
Surface Hole Latitude: 54.146991
Surface Hole Longitude: -116.161286

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-01-21 Obtained License
1958-03-04 Drill Stem Test Performed
1958-04-15 Lost Circulation Occurred
1958-04-17 Liner Casing Operation Performed
1958-04-30 Finished Drilling
1958-06-03 Perforation Treatment Performed - Jet Perforation
1958-06-04 Well Mode changed to Drilled and Cased
1961-06-26 Perforation Treatment Performed - Jet Perforation
1961-06-27 Perforation Treatment Performed - Jet Perforation
1961-06-27 Well Log Performed
1961-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-04-10 Well Began Production
1962-04-10 Well Fluid changed to Gas
1962-04-10 Well Mode changed to Flowing
1963-11-19 Perforation Treatment Performed - Jet Perforation
1963-11-19 Perforation Treatment Performed - Selective Jet Perforations
1964-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-02-26 Perforation Treatment Performed - Jet Perforation
1980-09-18 Well Log Performed
1986-10-13 Well Began Injection
1986-10-13 Well Fluid changed to Gas
1986-10-13 Well Type changed to Injection
1988-07-01 Well Fluid changed to Gas
1988-07-01 Well Mode changed to Flowing
1989-07-01 Well Fluid changed to Gas
1989-07-01 Well Type changed to Storage
1990-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-23 Perforation Treatment Performed - Cement Squeeze
1990-02-25 Well Log Performed
1990-02-28 Well Log Performed
1990-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-01 Perforation Treatment Performed - Jet Perforation
1990-03-01 Well Log Performed
1990-03-02 Well Log Performed
1993-03-01 Well Fluid changed to Gas
1993-03-01 Well Mode changed to Suspended
1993-03-01 Well Type changed to Storage
2005-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-17 Plug Back Performed
2005-10-17 Well Fluid changed to Gas
2005-10-17 Well Mode changed to Abandoned Zone
2005-10-17 Well Type changed to Storage
2005-10-19 Perforation Treatment Performed - Jet Perforation
2005-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-10-27 Perforation Treatment Performed - Jet Perforation
2007-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-18 Perforation Treatment Performed - Cement Plug
2007-08-18 Plug Back Performed
2007-08-18 Well Log Performed
2007-08-19 Well Log Performed
2007-08-20 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-06-03 Perforation 2590.80 2593.80 13
1964-02-26 Perforation 2639.60 2641.40 7
1990-02-18 Acid Treatment 2633.50 2641.40 0
1990-02-20 Acid Treatment 2590.80 2625.90 0
1990-02-23 Cement Squeeze 2590.80 2625.90 0
1990-03-01 Perforation 2590.00 2593.30 13
1990-03-01 Acid Treatment 2590.00 2593.30 0
2005-10-17 Packing Device Capped w/Cement 2502.00 2510.00 0
2005-10-19 Perforation 1973.00 1979.00 17
2005-10-22 Acid Treatment 1973.00 1979.00 0
2005-10-27 Perforation 1943.00 1948.00 17
1961-06-26 Perforation 2622.80 2625.90 7
2005-10-27 Perforation 1943.00 1948.00 17
2007-08-18 Cement Plug 1956.00 1964.00 0
2007-08-18 Packing Device Capped w/Cement 1933.00 1941.00 0
2007-08-20 Perforation 1905.90 1911.90 17
1961-06-26 Perforation 2619.50 2625.90 7
1961-06-27 Perforation 2593.80 2619.50 7
1961-08-15 Acid Treatment 2590.80 2625.90 0
1963-11-19 Selective Jet Perforations 2639.00 2639.30 0
1963-11-19 Perforation 2634.70 2637.70 7
1963-11-19 Selective Jet Perforations 2633.50 2634.10 3
1964-01-31 Acid Treatment 2590.80 2639.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 2737 0.0 0.0 0.0
1970 5537 0.0 0.0 0.0
1971 5725 0.0 0.0 0.0
1972 7297 0.0 0.0 0.0
1973 5156 0.0 0.0 0.0
1974 5690 0.0 0.0 0.0
1975 7590 0.0 0.0 0.0
1976 5360 0.0 0.0 0.0
1977 3798 0.0 0.0 0.0
1978 1892 0.0 0.0 0.0
1979 7244 0.0 0.0 0.0
1980 5685 0.0 0.0 0.0
1981 7413 0.0 0.0 0.0
1982 8106 0.0 0.0 0.0
1983 8103 0.0 0.0 0.0
1984 7796 0.0 0.0 0.0
1985 8631 0.0 0.0 0.0
1986 1965 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 3371 0.0 0.0 0.0
1989 2373 0.0 0.0 0.0
1990 4137 0.0 0.0 0.0
1991 4925 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1958-04-15 Lost Circulation 2596.90 2596.90

For data sources see[6]

References