Well Details

Well ID: 0595220408000
Loading map...
Location: 00/08-04-059-22W5/0
Location Alias: 00/08-04-59-22 W5M
Location Alias 2: 00/08-04-059-22 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 22
Section: 04
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN FIR 8-4-59-22
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0216106
License Date: 1998-06-24
License Status: Amended
Spud Date: 1998-08-23
Final Drill Date: 1998-09-10
Well Total Depth: 2840.00 m
Surface Hole Latitude: 54.069873
Surface Hole Longitude: -117.232155

For data sources see[1][2]

Well History

Date Event
1998-06-24 Obtained License
1998-08-23 Lost Circulation Occurred
1998-08-24 Well Log Performed
1998-08-25 Surface Casing Operation Performed
1998-09-10 Finished Drilling
1998-09-10 Well Log Performed
1998-09-10 Well Mode changed to Drilled and Cased
1998-09-12 Production Casing Operation Performed
1998-09-12 Rig Released
1998-10-12 Well Log Performed
1998-10-15 Perforation Treatment Performed - Open-Hole Completion
1998-10-15 Well Log Performed
1998-10-16 Perforation Treatment Performed - Cement Plug
1998-10-16 Plug Back Performed
1998-10-16 Well Log Performed
1998-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-17 Plug Back Performed
1998-10-17 Well Log Performed
1998-10-25 Perforation Treatment Performed - Jet Perforation
1998-10-31 Perforation Treatment Performed - Fractured
1998-12-09 Well Began Production
1998-12-09 Well Fluid changed to Gas
1998-12-09 Well Mode changed to Flowing
2001-02-19 Well Fluid changed to Gas
2001-02-19 Well Mode changed to Suspended
2002-03-28 Well Fluid changed to Gas
2002-03-28 Well Mode changed to Flowing
2011-06-01 Well Fluid changed to Gas
2011-06-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-10-15 Open Hole/Barefoot Completion 2771.00 2840.00 0
1998-10-16 Cement Plug 2780.00 2840.00 0
1998-10-17 Packing Device Capped w/Cement 2757.00 2765.00 0
1998-10-25 Perforation 2739.30 2740.50 18
1998-10-25 Perforation 2736.40 2737.20 18
1998-10-25 Perforation 2725.40 2726.50 18
1998-10-25 Perforation 2718.50 2719.30 18
1998-10-31 Fracture 2718.50 2740.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 512 0.0 0.0 0.0
1999 8694 0.0 0.0 0.0
2000 8591 0.0 0.0 0.0
2001 1416 0.0 0.0 0.0
2002 6594 0.0 0.0 0.0
2003 8631 0.0 0.0 0.0
2004 8569 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8495 0.0 0.0 0.0
2007 8639 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8591 0.0 0.0 0.0
2010 8592 0.0 0.0 0.0
2011 8543 0.0 0.0 0.0
2012 8747 0.0 0.0 0.0
2013 8557 0.0 0.0 0.0
2014 8467 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8560 0.0 0.0 0.0
2017 8447 0.0 0.0 0.0
2018 7743 0.0 0.0 0.0
2019 8093 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-08-23 Lost Circulation 35.00 300.00

For data sources see[6]

References