X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595232008020

Well Details

Well ID: 0595232008020
Loading map...
Location: 02/08-20-059-23W5/0
Location Alias: 02/08-20-59-23 W5M
Location Alias 2: 02/08-20-059-23 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 23
Section: 20
County/Municipality: Municipal District of Greenview No. 16
Well Name: MAPAN ENERGY BERLR 8-20-59-23
Operator Name: Tourmaline Oil Corp.
License Number: 0440024
License Date: 2011-12-01
License Status: Issued
Spud Date: 2011-12-23
Final Drill Date: 2012-01-13
Well Total Depth: 3791.00 m
Surface Hole Latitude: 54.120748
Surface Hole Longitude: -117.424333

For data sources see[1][2]

Well History

Date Event
2011-12-01 Obtained License
2011-12-24 Direction Drilling Operation Performed - Deviate
2011-12-24 Surface Casing Operation Performed
2011-12-26 Well Log Performed
2011-12-28 Direction Drilling Operation Performed - Horizontal
2012-01-06 Intermediate Casing Operation Performed
2012-01-13 Finished Drilling
2012-01-13 Well Mode changed to Drilled and Cased
2012-01-14 Well Log Performed
2012-01-15 Well Log Performed
2012-01-19 Liner Casing Operation Performed
2012-01-21 Rig Released
2012-08-31 Perforation Treatment Performed - Open-Hole Completion
2012-09-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-13 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-01 Well Fluid changed to Gas
2015-10-01 Well Mode changed to Testing
2017-03-01 Well Began Production
2017-03-01 Well Fluid changed to Gas
2017-03-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-24 520.00 Deviate (5 - 79 degrees)
2011-12-28 1725.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-31 Open Hole/Barefoot Completion 3787.00 3791.00 0
2012-09-12 Multi-Stage Fracture 3008.80 3010.10 0
2012-09-13 Multi-Stage Fracture 2906.20 2907.40 0
2012-09-13 Multi-Stage Fracture 2826.60 2827.80 0
2012-09-13 Multi-Stage Fracture 2748.70 2749.90 0
2012-09-13 Multi-Stage Fracture 2669.10 2670.30 0
2012-09-13 Multi-Stage Fracture 2614.00 2615.30 0
2012-09-12 Multi-Stage Fracture 3765.60 3766.60 0
2012-09-12 Multi-Stage Fracture 3636.90 3638.10 0
2012-09-12 Multi-Stage Fracture 3558.30 3559.50 0
2012-09-12 Multi-Stage Fracture 3466.60 3467.80 0
2012-09-12 Multi-Stage Fracture 3362.90 3364.20 0
2012-09-12 Multi-Stage Fracture 3271.60 3272.80 0
2012-09-12 Multi-Stage Fracture 3168.00 3169.20 0
2012-09-12 Multi-Stage Fracture 3088.40 3089.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 343 0.0 0.0 0.0
2017 6129 0.0 0.0 0.0
2018 8682 0.0 0.0 0.0
2019 8697 0.0 0.0 0.0
2020 2160 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-21 No Incident Encountered 0.00 0.00

For data sources see[7]

References