X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595261113000

Well Details

Well ID: 0595261113000
Loading map...
Location: 00/13-11-059-26W5/0
Location Alias: 00/13-11-59-26 W5M
Location Alias 2: 00/13-11-059-26 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 26
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE LELAND 13-11-59-26
Operator Name: Tourmaline Oil Corp.
License Number: 0405815
License Date: 2008-12-10
License Status: Amended
Spud Date: 2009-10-30
Final Drill Date: 2009-11-22
Well Total Depth: 4120.00 m
Surface Hole Latitude: 54.082184
Surface Hole Longitude: -117.784963

For data sources see[1][2]

Well History

Date Event
2008-12-10 Obtained License
2009-11-01 Surface Casing Operation Performed
2009-11-07 Direction Drilling Operation Performed - Horizontal
2009-11-14 Well Log Performed
2009-11-15 Intermediate Casing Operation Performed
2009-11-22 Finished Drilling
2009-11-22 Liner Casing Operation Performed
2009-11-22 Perforation Treatment Performed - Open-Hole Completion
2009-11-22 Well Log Performed
2009-11-22 Well Mode changed to Drilled and Cased
2009-11-24 Well Log Performed
2009-11-25 Rig Released
2010-02-02 Well Log Performed
2010-02-03 Well Log Performed
2010-02-10 Perforation Treatment Performed - Multi-Stage Fracture
2010-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2010-02-14 Well Fluid changed to Gas
2010-02-14 Well Mode changed to Testing
2010-02-19 Well Began Production
2010-02-19 Well Fluid changed to Gas
2010-02-19 Well Mode changed to Flowing
2013-11-01 Well Fluid changed to Gas
2013-11-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-11-07 2586.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-11-22 Open Hole/Barefoot Completion 4115.00 4120.00 0
2010-02-10 Multi-Stage Fracture 4086.40 4087.70 0
2010-02-10 Multi-Stage Fracture 3954.80 3955.60 0
2010-02-11 Multi-Stage Fracture 3799.30 3800.10 0
2010-02-11 Multi-Stage Fracture 3597.80 3598.60 0
2010-02-11 Multi-Stage Fracture 3397.60 3398.40 0
2010-02-11 Multi-Stage Fracture 3193.60 3194.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7551 0.0 0.0 0.0
2011 8639 0.0 0.0 0.0
2012 8762 0.0 0.0 0.0
2013 7934 0.0 0.0 0.0
2014 8631 0.0 0.0 0.0
2015 8609 0.0 0.0 0.0
2016 6357 0.0 0.0 0.0
2017 4589 0.0 0.0 0.0
2018 7653 0.0 0.0 0.0
2019 3891 0.0 0.0 0.0
2020 853 0.0 0.0 0.0

For data sources see[6]

References