If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0595261203000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.082143,"lon":-117.785099,"icon":""}]} |
| Location: 00/03-12-059-26W5/0 | |
| Location Alias: 00/03-12-59-26 W5M | |
| Location Alias 2: 00/03-12-059-26 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 059 | |
| Meridian: 5 | |
| Range: 26 | |
| Section: 12 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TOURMALINE LELAND 3-12-59-26 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0415834 | |
| License Date: 2009-12-18 | |
| License Status: Amended | |
| Spud Date: 2009-12-31 | |
| Final Drill Date: 2010-01-23 | |
| Well Total Depth: 4095.00 m | |
| Surface Hole Latitude: 54.082143 | |
| Surface Hole Longitude: -117.785099 |
| Date | Event |
|---|---|
| 2009-12-18 | Obtained License |
| 2010-01-02 | Surface Casing Operation Performed |
| 2010-01-08 | Direction Drilling Operation Performed - Horizontal |
| 2010-01-14 | Intermediate Casing Operation Performed |
| 2010-01-14 | Well Log Performed |
| 2010-01-23 | Finished Drilling |
| 2010-01-23 | Perforation Treatment Performed - Open-Hole Completion |
| 2010-01-23 | Well Mode changed to Drilled and Cased |
| 2010-01-24 | Liner Casing Operation Performed |
| 2010-01-26 | Well Log Performed |
| 2010-01-27 | Rig Released |
| 2010-02-02 | Well Log Performed |
| 2010-02-04 | Well Log Performed |
| 2010-02-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-02-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-02-11 | Well Fluid changed to Gas |
| 2010-02-11 | Well Mode changed to Testing |
| 2010-02-18 | Well Began Production |
| 2010-02-18 | Well Fluid changed to Gas |
| 2010-02-18 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-01-08 | 2593.80 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-01-23 | Open Hole/Barefoot Completion | 4070.00 | 4095.00 | 0 |
| 2010-02-08 | Multi-Stage Fracture | 4041.10 | 4042.40 | 0 |
| 2010-02-08 | Multi-Stage Fracture | 3904.70 | 3905.60 | 0 |
| 2010-02-09 | Multi-Stage Fracture | 3681.90 | 3682.70 | 0 |
| 2010-02-09 | Multi-Stage Fracture | 3451.40 | 3452.20 | 0 |
| 2010-02-09 | Multi-Stage Fracture | 3255.70 | 3256.50 | 0 |
| 2010-02-09 | Multi-Stage Fracture | 3019.10 | 3019.90 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 7538 | 0.0 | 0.0 | 0.0 |
| 2011 | 8663 | 0.0 | 0.0 | 0.0 |
| 2012 | 8762 | 0.0 | 0.0 | 0.0 |
| 2013 | 8471 | 0.0 | 0.0 | 0.0 |
| 2014 | 8685 | 0.0 | 0.0 | 0.0 |
| 2015 | 8715 | 0.0 | 0.0 | 0.0 |
| 2016 | 7455 | 0.0 | 0.0 | 0.0 |
| 2017 | 7870 | 0.0 | 0.0 | 0.0 |
| 2018 | 8592 | 0.0 | 0.0 | 0.0 |
| 2019 | 6516 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]