X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596021416020

Well Details

Well ID: 0596021416020
Loading map...
Location: 02/16-14-059-02W6/0
Location Alias: 02/16-14-59-02 W6M
Location Alias 2: 02/16-14-059-02 W6/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 02
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ 102 SMOKY 16-14-59-2
Operator Name: Jupiter Resources Inc.
License Number: 0479521
License Date: 2016-05-27
License Status: Amended
Spud Date: 2017-02-06
Final Drill Date: 2017-03-09
Well Total Depth: 5647.00 m
Surface Hole Latitude: 54.101474
Surface Hole Longitude: -118.211035

For data sources see[1][2]

Well History

Date Event
2016-05-27 Obtained License
2017-02-07 Surface Casing Operation Performed
2017-02-13 Intermediate Casing Operation Performed
2017-02-17 Direction Drilling Operation Performed - Deviate
2017-02-20 Direction Drilling Operation Performed - Horizontal
2017-03-09 Finished Drilling
2017-03-09 Well Log Performed
2017-03-09 Well Mode changed to Drilled and Cased
2017-03-11 Liner Casing Operation Performed
2017-03-13 Rig Released
2017-09-10 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-11 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-13 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-14 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-06 Well Fluid changed to Gas
2017-10-06 Well Mode changed to Testing
2017-11-13 Well Began Production
2017-11-13 Well Fluid changed to Gas
2017-11-13 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-02-06 Horizon Drilling Inc. 38 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-02-17 2989.70 Deviate (5 - 79 degrees)
2017-02-20 3365.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-10 Multi-Stage Fracture 5610.90 5611.00 0
2017-09-11 Multi-Stage Fracture 4794.60 4794.70 0
2017-09-11 Multi-Stage Fracture 4703.80 4703.90 0
2017-09-11 Multi-Stage Fracture 4613.10 4613.20 0
2017-09-13 Multi-Stage Fracture 4522.60 4522.70 0
2017-09-13 Multi-Stage Fracture 4432.00 4432.10 0
2017-09-13 Multi-Stage Fracture 4341.70 4341.80 0
2017-09-13 Multi-Stage Fracture 4251.00 4251.10 0
2017-09-13 Multi-Stage Fracture 4160.30 4160.40 0
2017-09-13 Multi-Stage Fracture 4069.70 4069.80 0
2017-09-13 Multi-Stage Fracture 3979.10 3979.20 0
2017-09-10 Multi-Stage Fracture 5519.60 5519.70 0
2017-09-14 Multi-Stage Fracture 3888.50 3888.60 0
2017-09-14 Multi-Stage Fracture 3797.80 3797.90 0
2017-09-14 Multi-Stage Fracture 3707.20 3707.30 0
2017-09-14 Multi-Stage Fracture 3616.50 3616.60 0
2017-09-14 Multi-Stage Fracture 3525.80 3525.90 0
2017-09-11 Multi-Stage Fracture 5428.80 5428.90 0
2017-09-11 Multi-Stage Fracture 5337.90 5338.00 0
2017-09-11 Multi-Stage Fracture 5247.30 5247.40 0
2017-09-11 Multi-Stage Fracture 5156.60 5156.70 0
2017-09-11 Multi-Stage Fracture 5066.70 5066.80 0
2017-09-11 Multi-Stage Fracture 4975.90 4976.00 0
2017-09-11 Multi-Stage Fracture 4885.30 4885.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-09-10 2017-09-14 3,250 20,088 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.8753 N/A
30/50 Prime Plus Calfrac Quartz 14808-60-7 100 1.6913 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.5045 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.7346 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0107 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0107 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0954 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.066 N/A
Non-Hazardous Ingredients Trade Secret 100 0.066 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0631 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0631 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0631 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-09-10 2017-09-14 Surface Water - Lake 21697

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 1244 0.0 0.0 0.0
2018 8130 0.0 0.0 0.0
2019 8182 0.0 0.0 0.0
2020 2134 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-20 No Incident Encountered 0.00 0.00
2017-11-13 No Incident Encountered 0.00 0.00

For data sources see[10]

References